tap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024).

Open in Projects

Unparsed

Key facts

Unparsed
Voltage
345 kV
Capacity queued
580.8 MW, 2 active projects
Queue
ERCOT
Kind
Unparsed
Voltage
345 kV
Bus number
—
Jurisdiction
US-TX
Substation
—
Active queued (MW)
580.8 across 2 projects
Withdrawn or canceled (MW)
0 across 0
Built (MW)
0 across 0
About this point

A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.

By technology

Projects at this point by technology, largest active capacity first.
Technology Active MW Active projects All projects
Wind 580.8 2 2

Projects connecting here

All 2 in Projects

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution