The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS.
Unparsed
Key facts
Unparsed- Voltage
- 69 kV
- Capacity queued
- 101.7 MW, 1 active project
- Queue
- ERCOT
- Kind
- Unparsed
- Voltage
- 69 kV
- Bus number
- —
- Jurisdiction
- US-TX
- Substation
- —
- Active queued (MW)
- 101.7 across 1 project
- Withdrawn or canceled (MW)
- 0 across 0
- Built (MW)
- 0 across 0
About this point
A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Solar | 101.7 | 1 | 1 |
Projects connecting here
- Studied Young Road Solar