Substation
Key facts
Substation- Voltage
- 70 kV
- Capacity queued
- 70 MW, 1 active project
- Queue
- CAISO
- Kind
- Substation
- Voltage
- 70 kV
- Bus number
- —
- Jurisdiction
- US-CA
- Substation
- —
- Active queued (MW)
- 70 across 1 project
- Withdrawn or canceled (MW)
- 38.3 across 2
- Built (MW)
- 0 across 0
About this point
A grid connection point as CAISO Public Queue Report names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Solar + storage | 70 | 1 | 1 |
| Solar | 0 | 0 | 2 |
Projects connecting here
- Under construction Jasmine
- Withdrawn HELIOS PRIME
- Withdrawn Maricopa East Solar
Sources
1 sourceSources CAISO