Line tap

Key facts

Line tap
Voltage
230 kV
Capacity queued
300 MW, 1 active project
Queue
CAISO
Kind
Line tap
Voltage
230 kV
Bus number
—
Jurisdiction
US-CA
Substation
—
Active queued (MW)
300 across 1 project
Withdrawn or canceled (MW)
0 across 0
Built (MW)
0 across 0
About this point

A grid connection point as CAISO Public Queue Report names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.

By technology

Projects at this point by technology, largest active capacity first.
Technology Active MW Active projects All projects
Storage 300 1 1

Projects connecting here

All 1 in Projects