Substation
Key facts
Substation- Capacity queued
- 0 MW, 0 active projects
- Queue
- CAISO
- Kind
- Substation
- Voltage
- —
- Bus number
- —
- Jurisdiction
- US-CA
- Substation
- —
- Active queued (MW)
- 0 across 0 projects
- Withdrawn or canceled (MW)
- 500 across 1
- Built (MW)
- 3 across 1
About this point
A grid connection point as CAISO Public Queue Report names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Solar | 0 | 0 | 1 |
| Solar thermal | 0 | 0 | 1 |
Projects connecting here
- Built RE GARLAND
- Withdrawn MOJAVE SOLEIL II
Sources
1 sourceSources CAISO