Weedpatch-Wheeler Ridge 70kV

Open in Projects

Line tap

Key facts

Line tap
Voltage
70 kV
Capacity queued
0 MW, 0 active projects

Projects connecting here

Projects that connect at this point: active first, then built, other and withdrawn, each by capacity.
Status Name Technology Capacity (MW) Jurisdiction Proposed online
Withdrawn SIRIUS SOLAR Solar 20 US-CA Aug 23, 2017

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 15, 2026Source: California ISO

Every source and license · Attribution