230 kV bus at the Kelso Substation via the Mariposa Energy 230 kV tie line
Line tap
Key facts
Line tap- Voltage
- 230 kV
- Capacity queued
- 0 MW, 0 active projects
- Queue
- CAISO
- Kind
- Line tap
- Voltage
- 230 kV
- Bus number
- —
- Jurisdiction
- US-CA
- Substation
- —
- Active queued (MW)
- 0 across 0 projects
- Withdrawn or canceled (MW)
- 20 across 1
- Built (MW)
- 0 across 0
About this point
A grid connection point as CAISO Public Queue Report names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Storage | 0 | 0 | 1 |
Projects connecting here
- Withdrawn GOLDENEYE ENERGY STORAGE CENTER
Sources
1 sourceSources CAISO