D'Arrigo Brothers - Phase 4 — Power plant · Solar · CalCom EnergyMoonlight Packing - Phase 2 — Power plant · Solar · CalCom EnergyGraniterock Quarry — Power plant · Solar · CalCom EnergyCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 5.3 mi awayRenz Energy Storage — Postponed · Storage · CA · 20 MW · 9.3 mi awayGilroy Data Center - Temp Crane — Filed · Large load · CA · 9.4 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 9.7 mi awayAWS DATA CENTER GILROY - SFO069 — Large load · CA · 9.8 mi awayMarina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 10.0 mi awaySanger USD - Sanger West HS — Under construction · Solar + storage · CA · 1.4 MW · 14.5 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

CalCom Energy

Follow this company

Power plant owner

Key facts

Power plant owner · 8 MW
Assets
3
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 3

Assets

3

Capacity

8.0 MW

MW by fuel
  1. Solar: 8.0 MW, 3 assets

Operates 3 power plants

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 7

within 15 mi

Projects

7

within 15 mi

Nearest

5.3 mi

Crazy Horse Solar Project

All 7NearbyShowing all 7 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Crazy Horse Solar Project Solar 2 MW 5.3 mi away nearest: Graniterock Quarry
Postponed Renz Energy Storage Storage 20 MW 9.3 mi away nearest: Graniterock Quarry
Filed Gilroy Data Center - Temp Crane Large load — 9.4 mi away nearest: Graniterock Quarry
Postponed CA Moss Landing 3040 Hilltop Rd Solar + storage 2.2 MW 9.7 mi away nearest: Graniterock Quarry
Unknown AWS DATA CENTER GILROY - SFO069 Large load — 9.8 mi away nearest: Graniterock Quarry
Announced Marina Landfill Gas Biomass 6.4 MW 10.0 mi away nearest: D'Arrigo Brothers - Phase 4
Under construction Sanger USD - Sanger West HS Solar + storage 1.4 MW 14.5 mi away nearest: Moonlight Packing - Phase 2

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Every source and license · Attribution