San Diego - EMDF at San Diego — Power plant · Solar · California PV Energy 3, LLCSan Diego - NCRC at Vista — Power plant · Solar · California PV Energy 3, LLCCarlsbad Energy Center — Postponed · Gas, combustion turbine · CA · 105.5 MW · 5.7 mi awayDon Lee BESS 1 LLC — Postponed · Storage · CA · 6.5 MW · 8.9 mi awayEnterprise BESS — Permitted · Storage · CA · 54.1 MW · 9.3 mi awayEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 10.3 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 12.4 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 14.8 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 15.0 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

California PV Energy 3, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 4.7 MW
Assets
2
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 2 plants recorded as wholly owned.2 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2021 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20257,7727,772
20247,6807,680
20237,6457,645
20228,0858,085
2021 (part year)3,6403,640

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 2

Assets

2

Capacity

4.7 MW

MW by fuel
  1. Solar: 4.7 MW, 2 assets

Operates 2 power plants

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 7

within 15 mi

Projects

7

within 15 mi

Nearest

5.7 mi

Carlsbad Energy Center

All 7NearbyShowing all 7 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Carlsbad Energy Center Gas, combustion turbine 105.5 MW 5.7 mi away nearest: San Diego - NCRC at Vista
Postponed Don Lee BESS 1 LLC Storage 6.5 MW 8.9 mi away nearest: San Diego - NCRC at Vista
Permitted Enterprise BESS Storage 54.1 MW 9.3 mi away nearest: San Diego - NCRC at Vista
Postponed EnerSmart Imperial Beach BESS Storage 6 MW 10.3 mi away nearest: San Diego - EMDF at San Diego
Under construction CA National City Terminal Ave Solar 1.1 MW 12.4 mi away nearest: San Diego - EMDF at San Diego
Postponed EnerSmart El Cajon BESS Storage 3 MW 14.8 mi away nearest: San Diego - EMDF at San Diego
Postponed Alvarado Hydro Facility Hydro 1.4 MW 15.0 mi away nearest: San Diego - EMDF at San Diego

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution