CES Agawam Tuckahoe Solar Hybrid — Power plant · Solar · CES Agawam Tuckahoe Solar LLCHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 7.8 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 8.7 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 8.9 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 9.0 mi awayPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 9.7 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 10.3 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 10.4 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 11.0 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 11.5 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 13.3 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 14.9 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

CES Agawam Tuckahoe Solar LLC

Show on map

Follow this company

Independent power producer

Key facts

Independent power producerNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
1
States
MA
Registered in
United States

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2021 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20256,6646,664
20246,7746,774
20236,9936,993
20226,6956,695
2021 (part year)3535

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

6.2 MW

MW by fuel
  1. Solar: 6.2 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 11

within 15 mi

Projects

11

within 15 mi

Nearest

7.8 mi

Holyoke MA BESS 1

All 11NearbyShowing all 11 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Holyoke MA BESS 1 Storage 5 MW 7.8 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Announced CT Airport Authority Solar One Solar 4 MW 8.7 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Under construction Chicopee BESS Storage 5 MW 8.9 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Under construction Windsor Locks Solar 1.8 MW 9.0 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Palmer Renewable Energy Biomass 42 MW 9.7 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Dollar Tree Solar One Solar 2 MW 10.3 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Filed Broadleaf Solar Solar 200 MW 10.4 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Riverside Holyoke Hydro 1.1 MW 11.0 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Hadley Falls Hydro 3.5 MW 11.5 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Stony Brook Gas, combined cycle 422 MW 13.3 mi away nearest: CES Agawam Tuckahoe Solar Hybrid
Postponed Ellington Solar One Solar 2 MW 14.9 mi away nearest: CES Agawam Tuckahoe Solar Hybrid

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution