Chillingham Storage — Power plant · Storage · Chillingham Storage LLCChillingham Solar — Built · Solar · TX · 352.4 MW · 0.1 mi awayAUS02 DATA CENTER — Under construction · Large load · TX · 3.7 mi awayAUS01 (Temple data centre) — Filed · Large load · TX · 4.0 mi awayCC2500 - AUS01 Temple TX (Temple data centre) — Filed · Large load · TX · 4.7 mi awayAUS04 DATA CENTER — Under construction · Large load · TX · 5.5 mi awayHermes Storage BESS — Under construction · Solar + storage · TX · 200.8 MW · 6.8 mi awayLimewood Bell Renewables Solar — Under construction · Solar + storage · TX · 254.6 MW · 8.6 mi awaySypert Branch Solar — Built · Solar · TX · 261.1 MW · 9.7 mi awayBig Elm Storage — Postponed · Storage · TX · 100 MW · 9.8 mi awayTEMPLE 5MW DATA CENTER — Built · Large load · TX · 10.1 mi awayRosebud Solar, LLC — Postponed · Solar · TX · 132 MW · 13.8 mi away
  • Storage
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Chillingham Storage LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 150 MW
Assets
1
States
TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2025 to 2026
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearStorageTotal (MWh)
2026 (part year)-13,960-13,960
2025 (part year)-7,905-7,905

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

150 MW

MW by fuel
  1. Storage: 150 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 11

within 15 mi

Projects

11

within 15 mi

Nearest

0.1 mi

Chillingham Solar

All 11NearbyShowing all 11 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Built Chillingham Solar Solar 352.4 MW 0.1 mi away nearest: Chillingham Storage
Under construction AUS02 DATA CENTER Large load — 3.7 mi away nearest: Chillingham Storage
Filed AUS01 (Temple data centre) Large load — 4.0 mi away nearest: Chillingham Storage
Filed CC2500 - AUS01 Temple TX (Temple data centre) Large load — 4.7 mi away nearest: Chillingham Storage
Under construction AUS04 DATA CENTER Large load — 5.5 mi away nearest: Chillingham Storage
Under construction Hermes Storage BESS Solar + storage 200.8 MW 6.8 mi away nearest: Chillingham Storage
Under construction Limewood Bell Renewables Solar Solar + storage 254.6 MW 8.6 mi away nearest: Chillingham Storage
Built Sypert Branch Solar Solar 261.1 MW 9.7 mi away nearest: Chillingham Storage
Postponed Big Elm Storage Storage 100 MW 9.8 mi away nearest: Chillingham Storage
Built TEMPLE 5MW DATA CENTER Large load — 10.1 mi away nearest: Chillingham Storage
Postponed Rosebud Solar, LLC Solar 132 MW 13.8 mi away nearest: Chillingham Storage

Sources ERCOT · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026

Every source and license · Attribution