Atrisco Energy Storage — Power plant · Storage · Atrisco Energy Storage LLCAtrisco Solar LLC — Power plant · Solar · Atrisco Solar LLCQuail Ranch Solar and BESS — Power plant · Storage · Quail Ranch Solar and Battery Energy Storage SystemRoadrunner Solar and BESS — Power plant · Storage · Clenera LLCApache Station — Postponed · Gas, combustion turbine · AZ · 102.2 MW · 3.0 mi awayTHREE SISTERS Solar Generation and BESS — Filed · Solar + storage · AZ · 600 MW · 6.9 mi awayWinchester Solar I, LLC — Under construction · Solar + storage · AZ · 175.6 MW · 7.0 mi awayCNM WESTSIDE DATA CENTER — Filed · Large load · NM · 7.3 mi awayWinchester Solar II, LLC — Under construction · Solar + storage · AZ · 175.6 MW · 8.4 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 9.5 mi awayWESTPOINTE DATA CENTER — Built · Large load · NM · 9.8 mi awayOSO GRANDE TECHNOLOGY — Filed · Large load · NM · 13.5 mi awayCorazon Energy Storage — Under construction · Storage · NM · 150 MW · 14.5 mi awayALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER — Built · Large load · NM · 14.8 mi away
  • Wind & solar
  • Storage
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Independent power producer

Key facts

Independent power producer · 1,270 MW
Assets
4
Projects
1
States
AZ, NM
Companies below
1
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

3 of 4 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 3 of 4 plants with a stake: US plants with an EIA monthly series.100% of the output is from 3 plants recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2024 to 2026
  • Solar
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarStorageTotal (MWh)
2026 (part year)563,448605,3741,168,822
2025717,74964,402782,151
2024 (part year)117,967—117,967

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Projects 1

Projects

1

all statuses

Capacity

0.30 GW

0.30 GW active

Projects sponsored by this company, sorted by capacity, largest first.
Status Name. Sort by name, A to Z Type MW, sorted descending. Sort by capacity, smallest first State Online. Sort by proposed online date, latest first Source
Studied Horseshoe Bend Solar Solar 301.1 MW TX Online Feb 20, 2028 ERCOT

Sources ERCOT

Sources

  • ERCOT1 projectretrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 10

within 15 mi

Projects

10

within 15 mi

Nearest

3.0 mi

Apache Station

All 10NearbyShowing all 10 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Apache Station Gas, combustion turbine 102.2 MW 3.0 mi away nearest: Roadrunner Solar and BESS
Filed THREE SISTERS Solar Generation and BESS Solar + storage 600 MW 6.9 mi away nearest: Roadrunner Solar and BESS
Under construction Winchester Solar I, LLC Solar + storage 175.6 MW 7.0 mi away nearest: Roadrunner Solar and BESS
Filed CNM WESTSIDE DATA CENTER Large load — 7.3 mi away nearest: Quail Ranch Solar and BESS
Under construction Winchester Solar II, LLC Solar + storage 175.6 MW 8.4 mi away nearest: Roadrunner Solar and BESS
Permitted Oso Negro Storage 100 MW 9.5 mi away nearest: Atrisco Solar LLC
Built WESTPOINTE DATA CENTER Large load — 9.8 mi away nearest: Atrisco Solar LLC
Filed OSO GRANDE TECHNOLOGY Large load — 13.5 mi away nearest: Atrisco Solar LLC
Under construction Corazon Energy Storage Storage 150 MW 14.5 mi away nearest: Atrisco Solar LLC
Built ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Large load — 14.8 mi away nearest: Atrisco Solar LLC

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution