Balzac Facility power station — Power plant · Gas, combined cycle · China National Offshore OilCalgary Energy Centre — Power plant · Gas, combined cycleCavalier Energy Centre — Power plant · Gas, combined cycle · Enmax EnergyShepard Energy Centre — Power plant · Gas, combined cycle · EnmaxCrossfield Energy Centre — Power plant · Gas, combustion turbineKettles Hill wind farm — Power plant · Wind · EnmaxTaber wind farm — Power plant · Wind · EnmaxBeacon AI Centers Indus Project CC2 — Gas, combined cycle · Canada · 261 MW · 6.3 km awayBeacon AI Centers Indus Project 1 — Gas, reciprocating engine · Canada · 460 MW · 6.3 km awayBeacon AI Centers Indus Project CC1 — Gas, combined cycle · Canada · 261 MW · 6.3 km awayBeacon AI Centers Indus Project CC4 — Gas, combined cycle · Canada · 261 MW · 6.3 km awayBeacon AI Centers Indus Project CC3 — Gas, combined cycle · Canada · 261 MW · 6.3 km awayWindy Point wind farm (Canada) -- — Wind · Canada · 51 MW · 13.7 km away
  • Combustion
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Enmax Corp

Follow this company

Power plant owner

Key facts

Power plant owner · 1,720 MW
Assets
7
Registered in
Canada
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Assets 7

Assets

7

Capacity

1,720 MW

MW by fuel
  1. Gas, combined cycle: 1,441 MW, 4 assets
  2. Gas, combustion turbine: 144 MW, 1 asset
  3. Wind: 135 MW, 2 assets

Operates 3 power plants · Owns 7 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Shepard Energy Centre Gas, combined cycle Operates and owns 881 MW — 50.0% Enmax Corp
Calgary Energy Centre Gas, combined cycle Owns 320 MW — 100.0% Enmax Corp
Crossfield Energy Centre Gas, combustion turbine Owns 144 MW — 100.0% Enmax Corp
Balzac Facility power station Gas, combined cycle Owns 120 MW — 50.0% Enmax Corp
Cavalier Energy Centre Gas, combined cycle Owns 120 MW — 100.0% Enmax Corp
Taber wind farm Wind Operates and owns 81 MW — 100.0% Enmax Corp
Kettles Hill wind farm Wind Operates and owns 54 MW — 100.0% Enmax Corp

Sources GEM

Sources

  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Open license, with credit · retrieved 26 Oct 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 6

within 25 km

Projects

6

within 25 km

Nearest

6.3 km

Beacon AI Centers Indus Project CC2

All 6NearbyShowing all 6 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Beacon AI Centers Indus Project CC2 Gas, combined cycle 261 MW 6.3 km away nearest: Shepard Energy Centre
Announced Beacon AI Centers Indus Project 1 Gas, reciprocating engine 460 MW 6.3 km away nearest: Shepard Energy Centre
Announced Beacon AI Centers Indus Project CC1 Gas, combined cycle 261 MW 6.3 km away nearest: Shepard Energy Centre
Announced Beacon AI Centers Indus Project CC4 Gas, combined cycle 261 MW 6.3 km away nearest: Shepard Energy Centre
Announced Beacon AI Centers Indus Project CC3 Gas, combined cycle 261 MW 6.3 km away nearest: Shepard Energy Centre
Cancelled Windy Point wind farm (Canada) -- Wind 51 MW 13.7 km away nearest: Kettles Hill wind farm

Sources GEM

Sources

  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Open license, with credit · retrieved 26 Oct 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution