- Combustion
- Wind & solar
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Operating
- Other companies nearby
12 assets
12 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 11 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
2 outside this view, drawn where they are: zoom out to see them.
Equinor ASA
Power plant owner
Key facts
Power plant owner · 4,138 MW- Capacity held
- 4,138MW
- Assets
- 12
- Projects
- 11
- Companies below
- 1
- Headquarters
- Stavanger, Norway Source: Wikidata
- Listed
- NYSE: EQNR Source: SEC EDGAR
- LEI
- OW6OFBNCKXC4US5C7523 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why
Projects 11
Capacity
8.83 GW
8.70 GW active
Including subsidiaries
Sources GEM
Assets 12
Assets
12
Capacity
4,138 MW
- Offshore wind: 2,074 MW, 4 assets
- Gas, combined cycle: 1,761 MW, 4 assets
- Solar: 303 MW, 4 assets
Owns 12 power plants
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 2
Companies
2
this one included
Parents
0
Subsidiaries
1
direct
Holding assets
2
of 2 companies in the group
-
Equinor ASA This company 12 assets4,138 MWwith the companies below
-
Danske Commodities A/S Subsidiary · share not stated 1 asset38 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Equinor ASA | This company | 11 | power plant |
| Danske Commodities A/S | Subsidiary | 1 | power plant |
Sources 3
Registers
3
Reuse terms
- 2 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 76
within 25 kmProjects
76
within 25 km
Nearest
4.4 km
Wikinger Süd wind farm --
All 76NearbyShowing all 76 nearby projects. The 50 nearest are listed.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Canceled | Wikinger Süd wind farm -- | Offshore wind | 10 MW | 4.4 km away | nearest: Arkona Becken SüDost wind farm |
| Announced | Cerrado (Enel) solar farm 5 | Solar | 43 MW | 5.3 km away | nearest: Apodi solar farm |
| Announced | Cerrado (Enel) solar farm 3 | Solar | 43 MW | 6.3 km away | nearest: Apodi solar farm |
| Announced | Cerrado (Enel) solar farm 4 | Solar | 43 MW | 6.7 km away | nearest: Apodi solar farm |
| Announced | Bericap Oslo Road Solar Panels -- | Solar | 1.3 MW | 7.6 km away | nearest: Saltend power station |
| Announced | Cerrado (Enel) solar farm 2 | Solar | 43 MW | 7.9 km away | nearest: Apodi solar farm |
| Announced | Cerrado (Enel) solar farm 1 | Solar | 43 MW | 8.1 km away | nearest: Apodi solar farm |
| Permitted | North Killingholme Power Project | Gas, combined cycle | 540 MW | 8.5 km away | nearest: Saltend power station |
| Announced | Bowmar Carr Road Burton Pidsea Solar Array -- | Solar | 1 MW | 9.8 km away | nearest: Saltend power station |
| Announced | Far Marsh Farm wind farm 2 | Wind | 7.5 MW | 10.3 km away | nearest: Saltend power station |
| Canceled | Croxby Hall Farm Inglemire Lane Solar Farm & Battery Storage -- | Solar | 9.7 MW | 10.5 km away | nearest: Saltend power station |
| Filed | VPI Immingham B OCGT | Gas, combustion turbine | 299 MW | 10.9 km away | nearest: Saltend power station |
| Canceled | Snuff Mill Lane Gates Solar Farm & Battery Storage solar project -- | Solar | 9.7 MW | 11.3 km away | nearest: Saltend power station |
| Announced | Nordre Sørøy wind farm -- | Wind | 200 MW | 12.2 km away | nearest: Hammerfest Snohvit Terminal power station |
| Canceled | Arapuá solar farm 5 | Solar | 50 MW | 12.4 km away | nearest: Apodi solar farm |
| Canceled | Arapuá solar farm 7 | Solar | 50 MW | 12.4 km away | nearest: Apodi solar farm |
| Announced | Shed 10 Alexandra Road South Immingham Docks solar project -- | Solar | 1.4 MW | 12.5 km away | nearest: Saltend power station |
| Announced | Port Of Immingham West Riverside, Immingham Docks wind farm -- | Wind | 4.2 MW | 12.5 km away | nearest: Saltend power station |
| Permitted | Creyke Beck Battery 2 | Storage | 28.5 MW | 12.6 km away | nearest: Saltend power station |
| Filed | KENLEY HOUSE SOLAR PARK | Solar | 150 MW | 12.8 km away | nearest: Saltend power station |
| Canceled | Arapuá solar farm 8 | Solar | 50 MW | 12.9 km away | nearest: Apodi solar farm |
| Under construction | Arapuá solar farm 3 | Solar | 50 MW | 13.1 km away | nearest: Apodi solar farm |
| Canceled | Monkwith II wind farm -- | Wind | 6.9 MW | 13.3 km away | nearest: Saltend power station |
| Announced | Jaguaruana I solar farm 7 | Solar | 48.1 MW | 13.4 km away | nearest: Apodi solar farm |
| Under construction | Arapuá solar farm 4 | Solar | 50 MW | 13.4 km away | nearest: Apodi solar farm |
| Canceled | Arapuá solar farm 6 | Solar | 50 MW | 13.5 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 12 | Solar | 50 MW | 13.5 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana I solar farm 6 | Solar | 48.1 MW | 13.6 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana I solar farm 5 | Solar | 41.2 MW | 13.7 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 1 | Solar | 50 MW | 13.9 km away | nearest: Apodi solar farm |
| Under construction | Arapuá solar farm 1 | Solar | 50 MW | 14.0 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 13 | Solar | 50 MW | 14.1 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 2 | Solar | 50 MW | 14.2 km away | nearest: Apodi solar farm |
| Under construction | Arapuá solar farm 2 | Solar | 50 MW | 14.3 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana I solar farm 4 | Solar | 48.1 MW | 14.6 km away | nearest: Apodi solar farm |
| Canceled | Docking Shoal A wind farm -- | Offshore wind | 540 MW | 14.7 km away | nearest: Dudgeon wind farm |
| Canceled | Monkwith wind farm -- | Wind | 14 MW | 14.9 km away | nearest: Saltend power station |
| Unknown | Mauxhall Farm solar farm -- | Solar | 18 MW | 15.1 km away | nearest: Saltend power station |
| Announced | Jaguaruana I solar farm 3 | Solar | 41.2 MW | 15.6 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 3 | Solar | 50 MW | 15.7 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 8 | Solar | 50 MW | 16.1 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 4 | Solar | 50 MW | 16.2 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana I solar farm 2 | Solar | 41.2 MW | 16.3 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 9 | Solar | 37.5 MW | 16.5 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 5 | Solar | 50 MW | 16.6 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 10 | Solar | 50 MW | 16.7 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana I solar farm 1 | Solar | 44.7 MW | 16.8 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 11 | Solar | 50 MW | 17.0 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 6 | Solar | 50 MW | 17.3 km away | nearest: Apodi solar farm |
| Announced | Jaguaruana solar project 7 | Solar | 50 MW | 17.7 km away | nearest: Apodi solar farm |
Supported by National Energy SO Open Data
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- NESOSupported by National Energy SO Open Data