Outer Cape Community Battery — Power plant · Storage · EversourceProject #1 - Groton LF — RNG project · Landfill gas to electricity · EversourceGroton Flanders Road Landfill — Under construction · Solar · CT · 5 MW · 3.3 km awaySubase Microgrid Project — Postponed · Gas, reciprocating engine · CT · 13.1 MW · 3.4 km awayCMEEC - Hollyhock Solar — Postponed · Solar · CT · 6 MW · 17.6 km away
  • Storage
  • Operating
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Eversource

Follow this company

Utility

Key facts

Utility · 25.2 MW
Assets
2
Projects
1
States
CT, MA
Headquarters
Berlin, United States Source: Wikidata
LEI
SJ7XXD41SQU3ZNWUJ746 Source: Wikidata
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2022 to 2026
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearStorageTotal (MWh)
2026 (part year)-54-54
2025-60-60
2024-59-59
2023-42-42
2022 (part year)-78-78

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Sources 3

Registers

3

Reuse terms

  • 3 Open license

Latest read

2026-11-09

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Nov 4, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • EPA LMOP ·

    EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

    Open license · retrieved Nov 9, 2026

    US federal work — public domain under 17 U.S.C. §105 for EPA-authored data; EPA's copyright-status page hedges ("Commercial use of the documents available from the EPA websites may be protected"), quoted and assessed in docs/13-legal-data-rights.md section 2.12; counsel item 7.x before publication

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 3

within 25 km

Projects

3

within 25 km

Nearest

3.3 km

Groton Flanders Road Landfill

All 3NearbyShowing all 3 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Groton Flanders Road Landfill Solar 5 MW 3.3 km away nearest: Project #1 - Groton LF
Postponed Subase Microgrid Project Gas, reciprocating engine 13.1 MW 3.4 km away nearest: Project #1 - Groton LF
Postponed CMEEC - Hollyhock Solar Solar 6 MW 17.6 km away nearest: Project #1 - Groton LF

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution