Freestone Energy Center — Power plant · Gas, combined cycle · Freestone Power Generation LLCPin Oak Creek Energy Center, LLC — Power plant · Gas, combustion turbine · Freestone Power Generation LLCAmerada — Studied · Solar + storage · TX · 452.4 MW · 2.0 mi awayTimber Cove Solar — Studied · Solar · TX · 100.5 MW · 2.7 mi awayBig Brown — Postponed · Coal · TX · 800 MW · 5.9 mi awayArmadillo Solar Center — Under construction · Solar · TX · 150.5 MW · 9.1 mi awayApex Bethel Energy Center — Postponed · Storage · TX · 317 MW · 11.6 mi awayItsee Solar — Postponed · Solar · TX · 53.3 MW · 13.5 mi away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Freestone Power Generation, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 1,480 MW
Assets
2
Projects
1
States
TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.0% of the output is from 0 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2002 to 2026
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
2026 (part year)4,220,3844,220,384
20256,479,9146,479,914
20246,855,2166,855,216
20237,559,6217,559,621
20226,386,9236,386,923
20215,796,5745,796,574
20206,859,9126,859,912
20197,381,5317,381,531
20186,394,9116,394,911
20175,343,0765,343,076
20165,955,9205,955,920
20155,733,0455,733,045
20144,087,2064,087,206
20133,984,1473,984,147
20125,316,9675,316,967
20114,269,6874,269,687
20104,734,0964,734,096
20093,263,7063,263,706
20083,771,8473,771,847
20074,046,1044,046,104
20063,169,5553,169,555
20054,027,6444,027,644
20044,420,5594,420,559
20034,800,0934,800,093
2002 (part year)3,100,1313,100,131

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Projects 1

Projects

1

all statuses

Capacity

0.21 GW

0.21 GW active

Projects sponsored by this company, sorted by capacity, largest first.
Status Name. Sort by name, A to Z Type MW, sorted descending. Sort by capacity, smallest first State Online. Sort by proposed online date, latest first Source
Studied Freestone Battery Storage Project Storage 210.5 MW TX Online Dec 16, 2028 ERCOT

Sources ERCOT

Sources

  • ERCOT1 projectretrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 6

within 15 mi

Projects

6

within 15 mi

Nearest

2.0 mi

Amerada

All 6NearbyShowing all 6 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Studied Amerada Solar + storage 452.4 MW 2.0 mi away nearest: Freestone Energy Center
Studied Timber Cove Solar Solar 100.5 MW 2.7 mi away nearest: Freestone Energy Center
Postponed Big Brown Coal 800 MW 5.9 mi away nearest: Freestone Energy Center
Under construction Armadillo Solar Center Solar 150.5 MW 9.1 mi away nearest: Pin Oak Creek Energy Center, LLC
Postponed Apex Bethel Energy Center Storage 317 MW 11.6 mi away nearest: Pin Oak Creek Energy Center, LLC
Postponed Itsee Solar Solar 53.3 MW 13.5 mi away nearest: Pin Oak Creek Energy Center, LLC

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution