Old Catawba PV 1 — Power plant · Solar · Strata Manager, LLCRJ Solar — Postponed · Solar · NC · 5 MW · 2.3 mi awayCLT04 LYLE CREEK DATA CENTER — Under construction · Large load · NC · 3.9 mi awayAustin Solar — Postponed · Solar · NC · 2 MW · 6.8 mi awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 7.4 mi awayCLT40 DATA CENTER — Under construction · Large load · NC · 8.0 mi awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 10.1 mi awayAPPLE INC. — Built · Large load · NC · 10.9 mi awayMICROSOFT CORPORATION, CLT17 — Built · Large load · NC · 11.7 mi awayClark Creek Solar Plant — Filed · Solar + storage · NC · 54 MW · 13.9 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Fresh Air Energy XV, LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 3.5 MW
Assets
1
States
NC
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2015 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20255,5265,526
20245,5855,585
20235,8055,805
20225,9985,998
20215,9025,902
20205,5985,598
20195,9655,965
20185,6395,639
20176,0196,019
20166,4656,465
2015 (part year)7272

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

3.5 MW

MW by fuel
  1. Solar: 3.5 MW, 1 asset

Owns 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 9

within 15 mi

Projects

9

within 15 mi

Nearest

2.3 mi

RJ Solar

All 9NearbyShowing all 9 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed RJ Solar Solar 5 MW 2.3 mi away nearest: Old Catawba PV 1
Under construction CLT04 LYLE CREEK DATA CENTER Large load — 3.9 mi away nearest: Old Catawba PV 1
Postponed Austin Solar Solar 2 MW 6.8 mi away nearest: Old Catawba PV 1
Under construction Maiden Creek Battery Storage 50 MW 7.4 mi away nearest: Old Catawba PV 1
Under construction CLT40 DATA CENTER Large load — 8.0 mi away nearest: Old Catawba PV 1
Built MICROSOFT CORPORATION, CLT10 Large load — 10.1 mi away nearest: Old Catawba PV 1
Built APPLE INC. Large load — 10.9 mi away nearest: Old Catawba PV 1
Built MICROSOFT CORPORATION, CLT17 Large load — 11.7 mi away nearest: Old Catawba PV 1
Filed Clark Creek Solar Plant Solar + storage 54 MW 13.9 mi away nearest: Old Catawba PV 1

Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air