- Combustion
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
- Other companies nearby
1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 1 project: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, cancelled, frozen or not stated). Each is in its tab below.
Intel Corporation
Power plant owner
Key facts
Power plant owner · 1.1 MW- Capacity held
- 1.1MW
- Assets
- 1
- Projects
- 1
- States
- CA
- Headquarters
- Santa Clara, United States Source: Wikidata
- Website
- intel.com Source: Wikidata
- Listed
- Nasdaq: INTC Source: SEC EDGAR
- LEI
- KNX4USFCNGPY45LOCE31 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
Yearly totals
| Year | Gas | Total (MWh) |
|---|---|---|
| 2025 | 6,875 | 6,875 |
| 2024 | 7,732 | 7,732 |
| 2023 | 7,279 | 7,279 |
| 2022 | 7,375 | 7,375 |
| 2021 | 7,165 | 7,165 |
| 2020 | 7,605 | 7,605 |
| 2019 | 7,458 | 7,458 |
| 2018 | 7,413 | 7,413 |
| 2017 | 7,529 | 7,529 |
| 2016 | 7,853 | 7,853 |
| 2015 | 8,425 | 8,425 |
Projects 1
Capacity
0.65 GW
0.65 GW active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Announced | Intel Power station 1 | Gas, combined cycle | 650 MW | Israel | — | Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) |
Sources GEM
Assets 1
Assets
1
Capacity
1.1 MW
- Gas, other: 1.1 MW, 1 asset
Owns 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Intel Santa Clara | Gas, other | Owns | 1.1 MW | US-CA | 100.0% | Intel Corporation |
Sources EIA-860M
Sources 4
Registers
4
Reuse terms
- 3 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 20
within 25 kmProjects
20
within 25 km
Nearest
0.1 km
EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT
All 20NearbyShowing all 20 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Unknown | EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT | Large load | — | 0.1 km away | nearest: Intel Santa Clara |
| Filed | Edgecore -3580 | Large load | — | 0.2 km away | nearest: Intel Santa Clara |
| Unknown | SV8 DATA CENTER | Large load | — | 1.1 km away | nearest: Intel Santa Clara |
| Unknown | VANTAGE DATA CENTERS MANAGEMENT CO , LLC | Large load | — | 1.4 km away | nearest: Intel Santa Clara |
| Under construction | Kifer BESS 1 | Storage | 50 MW | 1.4 km away | nearest: Intel Santa Clara |
| Built | 4054 Digital Realty | Large load | — | 1.8 km away | nearest: Intel Santa Clara |
| Built | PRIME DATA CENTERS | Large load | — | 2.0 km away | nearest: Intel Santa Clara |
| Filed | 1200 Memorex Skybox Data Center | Large load | — | 2.3 km away | nearest: Intel Santa Clara |
| Filed | LBA Data Center West | Large load | — | 2.6 km away | nearest: Intel Santa Clara |
| Built | SKYBOX DATA CENTER | Large load | — | 2.7 km away | nearest: Intel Santa Clara |
| Unknown | SJC02 & SJC03 DATA CENTER | Large load | — | 5.5 km away | nearest: Intel Santa Clara |
| Filed | 888 Ross Data Center | Large load | — | 6.3 km away | nearest: Intel Santa Clara |
| Filed | DC-N (San Jose data centre) | Large load | — | 7.7 km away | nearest: Intel Santa Clara |
| Filed | Data Center | Large load | — | 9.1 km away | nearest: Intel Santa Clara |
| Under construction | Fremont CA AutoFactory | Solar | 3.8 MW | 12.1 km away | nearest: Intel Santa Clara |
| Postponed | Waste Management Tri-Cities LFGTE | Biomass | 4.8 MW | 12.7 km away | nearest: Intel Santa Clara |
| Under construction | 7999 Gateway Solar | Solar | 4.6 MW | 16.6 km away | nearest: Intel Santa Clara |
| Announced | Gateway#1&2 (Newark CA) | Solar | 1.1 MW | 19.4 km away | nearest: Intel Santa Clara |
| Unknown | CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER | Large load | — | 23.1 km away | nearest: Intel Santa Clara |
| Filed | Equinix SV-19 - 131 Great Oaks Blvd SJ | Large load | — | 23.3 km away | nearest: Intel Santa Clara |
Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · CAISO · EIA-860M
Sources
- EPA ICIS-NPDES
- FAA OE/AAA
- EPA ICIS-Air
- CAISOSource: California ISO
- EIA-860M