Kings Beach — Power plant · Oil · Liberty Utilities (CalPeco Electric) LLCLuning Energy — Power plant · Solar · Liberty Utilities (CalPeco Electric) LLCTurquoise Liberty Solar — Power plant · Solar · Liberty Utilities (CalPeco Electric) LLCPeru Ridge - Data Center Building 1 — Filed · Large load · NV · 4.1 mi awayBZI Crane (BTS 107) (Sparks data centre) — Filed · Large load · NV · 4.9 mi awayMaxim Crane 6257 Edgecore RN01 Sparks — Filed · Large load · NV · 5.0 mi awayTesla Reno GigaFactory — Under construction · Solar · NV · 1 MW · 5.5 mi awayTesla Reno GigaFactory — Postponed · Solar · NV · 10.4 MW · 5.5 mi away
  • Combustion
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Liberty Utilities (CalPeco Electric) LLC

Show on map

Follow this company

Utility

Key facts

UtilityNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
3
States
CA, NV
Registered in
United States

Gross output of plants with a stake

3 of 3 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 3 of 3 plants with a stake: US plants with an EIA monthly series.100% of the output is from 3 plants recorded as wholly owned.3 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Oil
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearOilSolarTotal (MWh)
2026 (part year)—72,04972,049
20250110,073110,073
20240109,709109,709
20230140,030140,030
20220154,150154,150
20210148,918148,918
202010153,970153,980
2019280131,027131,307
2018274129,358129,632
2017314123,465123,779
2016225—225
2015498—498
2014399—399
201383—83
2012346—346
2011665—665
2010855—855
2009679—679
2008441—441
2007-509—-509
2006283—283
20052,970—2,970
2004123—123
2003-386—-386
2002-91—-91
2001-45—-45

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 3

Assets

3

Capacity

75.0 MW

MW by fuel
  1. Solar: 60.0 MW, 2 assets
  2. Oil: 15.0 MW, 1 asset

Operates 3 power plants

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

within 15 mi

Nearest

4.1 mi

Peru Ridge - Data Center Building 1

All 5NearbyShowing all 5 nearby projects. They fill 4 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first: 4 rows for the nearest of 5.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Peru Ridge - Data Center Building 1 Large load — 4.1 mi away nearest: Turquoise Liberty Solar
Filed BZI Crane (BTS 107) (Sparks data centre) Large load — 4.9 mi away nearest: Turquoise Liberty Solar
Filed Maxim Crane 6257 Edgecore RN01 Sparks Large load — 5.0 mi away nearest: Turquoise Liberty Solar
Under construction Tesla Reno GigaFactory × 2 units Solar 11.4 MW 5.5 mi away nearest: Turquoise Liberty Solar

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution