3 assets
3 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Nodal Power
RNG developer and Power plant owner
Key facts
RNG developer and Power plant owner · 8 MW- Assets
- 3
- States
- NM, UT
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Bioenergy
Yearly totals
| Year | Bioenergy | Total (MWh) |
|---|---|---|
| 2025 (part year) | 1,532 | 1,532 |
| 2024 | 11,849 | 11,849 |
| 2023 | 15,760 | 15,760 |
| 2022 | 9,547 | 9,547 |
| 2021 | 17,682 | 17,682 |
| 2020 | 18,925 | 18,925 |
| 2019 | 15,669 | 15,669 |
| 2018 | 4,955 | 4,955 |
| 2017 | 624 | 624 |
| 2016 | 855 | 855 |
Assets 3
Assets
3
2 kinds
Capacity
8.0 MW
- Landfill gas to electricity: 4.8 MW, 2 assets
- Biomass: 3.2 MW, 1 asset
Operates 2 RNG projects · Owns 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Nodal Power | Biomass | Owns | 3.2 MW | US-NM | 100.0% | Nodal Power |
| Project #1 - Camino Real Landfill | RNG project | Operates | 3.2 MW | US-NM | — | Nodal Power |
| Project #2 - Davis County Landfill | RNG project | Operates | 1.6 MW | US-UT | — | Nodal Power |
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-09
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EPA LMOP ·
EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
US federal work — public domain under 17 U.S.C. §105 for EPA-authored data; EPA's copyright-status page hedges ("Commercial use of the documents available from the EPA websites may be protected"), quoted and assessed in docs/13-legal-data-rights.md section 2.12; counsel item 7.x before publication
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 3
within 15 miProjects
3
within 15 mi
Nearest
5.4 mi
Project Miner County NM (Santa Teresa data centre)
All 3NearbyShowing all 3 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Filed | Project Miner County NM (Santa Teresa data centre) | Large load | — | 5.4 mi away | nearest: Nodal Power |
| Under construction | Santa Teresa Solar | Storage | 150 MW | 6.2 mi away | nearest: Nodal Power |
| Filed | Newman Buffer | Solar | 102.2 MW | 14.7 mi away | nearest: Nodal Power |
Sources FAA OE/AAA · EIA-860M