Menifee Power Bank — Power plant · Storage · Nova Power, LLCTrestles Grid LLC — Storage · CA · 150 MW · 0.9 km awaySan Jacinto Solar — Solar · CA · 1.5 MW · 11.2 km awayLake Perris Solar — Solar · CA · 1.5 MW · 11.4 km awayPerris DC 5 - sline015 — Solar · CA · 1.6 MW · 13.6 km awayAmazon - Moreno Valley — Solar · CA · 2.2 MW · 16.1 km awayWildomar Solar — Solar · CA · 1.2 MW · 16.8 km awayChiquito Grid, LLC — Storage · CA · 80 MW · 18.8 km awayRCWMD Badlands Landfill Gas Project — Biomass · CA · 1.2 MW · 24.7 km away
  • Storage
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Nova Power, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 680 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2024 to 2026
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearStorageTotal (MWh)
2026 (part year)-94,016-94,016
2025-117,451-117,451
2024 (part year)-59,437-59,437

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

680 MW

MW by fuel
  1. Storage: 680 MW, 1 asset

Operates 1 power plant

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

0.9 km

Trestles Grid LLC

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Trestles Grid LLC Storage 150 MW 0.9 km away nearest: Menifee Power Bank
Postponed San Jacinto Solar Solar 1.5 MW 11.2 km away nearest: Menifee Power Bank
Postponed Lake Perris Solar Solar 1.5 MW 11.4 km away nearest: Menifee Power Bank
Under construction Perris DC 5 - sline015 Solar 1.6 MW 13.6 km away nearest: Menifee Power Bank
Postponed Amazon - Moreno Valley Solar 2.2 MW 16.1 km away nearest: Menifee Power Bank
Postponed Wildomar Solar Solar 1.2 MW 16.8 km away nearest: Menifee Power Bank
Postponed Chiquito Grid, LLC Storage 80 MW 18.8 km away nearest: Menifee Power Bank
Postponed RCWMD Badlands Landfill Gas Project Biomass 1.2 MW 24.7 km away nearest: Menifee Power Bank