OwnSolar
- Wind & solar
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
- Other companies nearby
4 assets
4 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Power plant owner
- States
- CA, CT, NJ, NY
- Registered in
- United States
On the map, by stage
On the map, by stage
| Stage | Sites | MW | No MW |
|---|---|---|---|
| Planned | 0 | 0 | 0 |
| Under construction | 0 | 0 | 0 |
| Operating | 4 | 6.6 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Gross output of plants with a stake
4 of 4 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 4 of 4 plants with a stake: US plants with an EIA monthly series.100% of the output is from 4 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Solar
Yearly totals
| Year | Solar | Total (MWh) |
|---|---|---|
| 2025 | 11,341 | 11,341 |
| 2024 | 8,619 | 8,619 |
| 2023 | 11,684 | 11,684 |
| 2022 | 11,438 | 11,438 |
| 2021 | 11,379 | 11,379 |
| 2020 | 11,892 | 11,892 |
| 2019 | 11,509 | 11,509 |
| 2018 | 12,259 | 12,259 |
Assets 4
Assets
4
Capacity
6.6 MW
- Solar: 6.6 MW, 4 assets
Owns 4 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Preferred Freezer San Leandro | Solar | Owns | 2 MW | US-CA | 100.0% | OwnSolar |
| USAA Black Bear Energy | Solar | Owns | 1.9 MW | US-NJ | 100.0% | OwnSolar |
| Kinder Morgan Fordham | Solar | Owns | 1.7 MW | US-NY | 100.0% | OwnSolar |
| Corbin Russwin Phase 3 Berlin | Solar | Owns | 1 MW | US-CT | 100.0% | OwnSolar |
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 2
Registers
2
Reuse terms
- 1 Open license
- 1 Open license, with credit
Latest read
2026-10-30
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 44
within 15 miProjects
44
within 15 mi
Nearest
1.7 mi
San Leandro 10 - sleba702
All 44NearbyShowing all 44 nearby projects. They fill 43 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | San Leandro 10 - sleba702 | Solar | 1 MW | 1.7 mi away | nearest: Preferred Freezer San Leandro |
| Permitted | East Windsor Solar 1 LLC | Solar | 1.4 MW | 2.9 mi away | nearest: USAA Black Bear Energy |
| Under construction | Elevate Arthur Kill | Battery storage | 15.1 MW | 3.8 mi away | nearest: Kinder Morgan Fordham |
| Built | QTS Investments Properties Princeton LLC | Large load | — | 4.2 mi away | nearest: USAA Black Bear Energy |
| Built | Mcgraw Hill Inc | Large load | — | 4.3 mi away | nearest: USAA Black Bear Energy |
| Built | Bloomberg Data Center | Large load | — | 4.6 mi away | nearest: USAA Black Bear Energy |
| Postponed | Swiftsure | Battery storage | 121 MW | 4.7 mi away | nearest: Kinder Morgan Fordham |
| Unknown | Hayward Data Center | Large load | — | 6.3 mi away | nearest: Preferred Freezer San Leandro |
| Built | NU - Wethersfield Data Center | Large load | — | 6.3 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Postponed | Millstone Solar One | Solar | 2.8 MW | 7.1 mi away | nearest: USAA Black Bear Energy |
| Under construction | Proposed Data Center Development | Large load | — | 7.1 mi away | nearest: USAA Black Bear Energy |
| Built | Barclays Capital Data Center | Large load | — | 7.4 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Gateway Energy Center, LLC | Gas, combined cycle | 440 MW | 8.9 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Staten Island Energy Storage 1 LLC | Battery storage | 5 MW | 9.0 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Hartford Hospital Cogeneration | Gas, combustion turbine | 11.5 MW | 9.0 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Under construction | Prologis - SLNNJ036 - Community Solar | Solar | 1.6 MW | 9.1 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Middlesex Energy Center LLC | Gas, combined cycle | 570 MW | 9.2 mi away | nearest: Kinder Morgan Fordham |
| Announced | Dynegy Oakland Power Plant | Battery storage | 43.3 MW | 9.3 mi away | nearest: Preferred Freezer San Leandro |
| Under construction | Coreweave | Large load | — | 9.4 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Meriden Solar One | Solar | 1 MW | 9.6 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Under construction | BPL NJ - Union Distribution Center | Solar | 1.5 MW | 9.7 mi away | nearest: Kinder Morgan Fordham |
| Under construction | Elizabeth Metropolitan Logistics Center | Solar | 1.2 MW | 9.9 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Homestead Fuel Cell | Gas, other | 8.4 MW | 10.0 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Under construction | Milltown Onsite BESS | Battery storage | 13.2 MW | 10.0 mi away | nearest: USAA Black Bear Energy |
| Announced | Elevate Middletown | Battery storage | 275 MW | 10.4 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Under construction | Bayonne Energy Center | Battery storage | 49.8 MW | 10.8 mi away | nearest: Kinder Morgan Fordham |
| Postponed | AB Newark Solar | Solar | 5.6 MW | 11.0 mi away | nearest: Kinder Morgan Fordham |
| Under construction | Bishop Ranch - BR 3-HH | Solar + storage | 1.4 MW | 11.2 mi away | nearest: Preferred Freezer San Leandro |
| Under construction | Bishop Ranch - BR 3-FF | Solar + storage | 1.4 MW | 11.2 mi away | nearest: Preferred Freezer San Leandro |
| Under construction | Bishop Ranch - BR 3-GG | Solar + storage | 1.9 MW | 11.2 mi away | nearest: Preferred Freezer San Leandro |
| Postponed | Middletown Solar Two | Solar | 1.9 MW | 11.3 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Postponed | Middletown Solar One | Solar | 2 MW | 11.5 mi away | nearest: Corbin Russwin Phase 3 Berlin |
| Built | Barclays Capital Data Center | Large load | — | 11.7 mi away | nearest: Kinder Morgan Fordham |
| Built | Evoque Data Center Solutions - PNJ1 | Large load | — | 11.8 mi away | nearest: Kinder Morgan Fordham |
| Announced | Gateway#1&2 (Newark CA) | Solar | 1.1 MW | 12.8 mi away | nearest: Preferred Freezer San Leandro |
| Built | NJ 1 Data Center | Large load | — | 13.1 mi away | nearest: Kinder Morgan Fordham |
| Under construction | Prologis - SLCNJ001 - Community Solar | Solar | 3.2 MW | 13.7 mi away | nearest: Kinder Morgan Fordham |
| Withdrawn | San Francisco Electric Reliability Proj | Gas, combustion turbine | 151.5 MW | 13.7 mi away | nearest: Preferred Freezer San Leandro |
| Postponed | San Francisco Intl Airport Ct Project | Gas, combustion turbine | 48 MW | 13.8 mi away | nearest: Preferred Freezer San Leandro |
| Built | RAR Development Associates × 2 units | Large load | — | 13.8 mi away | nearest: Kinder Morgan Fordham |
| Under construction | 7999 Gateway Solar | Solar | 4.6 MW | 14.5 mi away | nearest: Preferred Freezer San Leandro |
| Postponed | Gowanus Gas Turbines Generating | Gas, combustion turbine | 93 MW | 14.7 mi away | nearest: Kinder Morgan Fordham |
| Postponed | Waterbury Solar One | Solar | 2 MW | 14.9 mi away | nearest: Corbin Russwin Phase 3 Berlin |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · CAISO
Sources
- EIA-860M
- EPA ICIS-Air
- EPA ICIS-NPDES
- FAA OE/AAA
- CAISOSource: California ISO