SunEdison Walgreens Moreno Valley — Power plant · Solar · SunE WG113 Moreno Valley LLCAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 0.6 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 1.2 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 6.1 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 6.1 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 8.7 mi awayTrestles Grid LLC — Postponed · Storage · CA · 150 MW · 9.5 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 13.2 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 14.1 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 14.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 14.4 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 15.0 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

SunE WG113 Moreno Valley LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 1 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2009 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
2025599599
2024900900
20231,2591,259
20221,0741,074
20211,3331,333
20201,4591,459
2019887887
20181,6811,681
20171,1911,191
2016941941
20151,7801,780
20141,8391,839
20131,8551,855
20121,9511,951
20111,9531,953
20101,9681,968
20092,0082,008

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

1.0 MW

MW by fuel
  1. Solar: 1.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 11

within 15 mi

Projects

11

within 15 mi

Nearest

0.6 mi

Amazon - Moreno Valley

All 11NearbyShowing all 11 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Amazon - Moreno Valley Solar 2.2 MW 0.6 mi away nearest: SunEdison Walgreens Moreno Valley
Under construction Perris DC 5 - sline015 Solar 1.6 MW 1.2 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed San Jacinto Solar Solar 1.5 MW 6.1 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed Lake Perris Solar Solar 1.5 MW 6.1 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed RCWMD Badlands Landfill Gas Project Biomass 1.2 MW 8.7 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed Trestles Grid LLC Storage 150 MW 9.5 mi away nearest: SunEdison Walgreens Moreno Valley
Under construction CA Riverside 2356 Fleetwood Dr. Solar + storage 4 MW 13.2 mi away nearest: SunEdison Walgreens Moreno Valley
Announced Energy Center Gas, combustion turbine 0.9 MW 14.1 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed SunE Redlands Solar 1.5 MW 14.3 mi away nearest: SunEdison Walgreens Moreno Valley
Postponed Solar Photovoltaic Project #24 Solar 4 MW 14.4 mi away nearest: SunEdison Walgreens Moreno Valley
Under construction Redlands DC 9 - sline609 Solar + storage 5 MW 15.0 mi away nearest: SunEdison Walgreens Moreno Valley

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution