Jiangsu Danyang Daoshuzhen (Three Gorges) solar farm — Power plant · Solar · Three Gorges New Energy Power Generation (Danyang)Jianbi power station Phase VIII Unit 15 — Announced · Carbon capture (CCS) · China · 1,000 MW · 18.6 km awayJianbi power station Phase VIII Unit 16 — Announced · Carbon capture (CCS) · China · 1,000 MW · 18.6 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Three Gorges New Energy Power Generation (Danyang)

Follow this company

Power plant owner

Key facts

Power plant owner · 120 MW
Assets
1
Registered in
China
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Capacity

120 MW

MW by fuel
  1. Solar: 120 MW, 1 asset

Operates 1 power plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 2

within 25 km

Projects

2

within 25 km

Nearest

18.6 km

Jianbi power station Phase VIII Unit 15

All 2NearbyShowing all 2 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Jianbi power station Phase VIII Unit 15 Carbon capture (CCS) 1,000 MW 18.6 km away nearest: Jiangsu Danyang Daoshuzhen (Three Gorges) solar farm
Announced Jianbi power station Phase VIII Unit 16 Carbon capture (CCS) 1,000 MW 18.6 km away nearest: Jiangsu Danyang Daoshuzhen (Three Gorges) solar farm

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution