Tianjin-1 power station — Power plant · CoalTianjin Northeast power station Phase II Unit 3 — Canceled · Coal · China · 350 MW · 16.2 km awayTianjin Northeast power station Phase II Unit 4 — Canceled · Coal · China · 350 MW · 16.2 km awayYangliuqing power station Phase V Unit 5 — Announced · Coal · China · 660 MW · 16.2 km awayYangliuqing power station Phase V Unit 6 — Announced · Coal · China · 660 MW · 16.2 km awayYangliuqing power station Phase V Unit 7 — Canceled · Coal · China · 600 MW · 16.2 km awayJunliangcheng power station Phase VI Unit 12 — Canceled · Coal · China · 350 MW · 18.0 km awayGreenGen power station Phase II Unit 1 — Canceled · Coal · China · 400 MW · 24.1 km awayGreenGen power station Phase II Unit 2 — Canceled · Coal · China · 400 MW · 24.1 km away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Tianjin First Thermal Power Plant

Follow this company

Power plant owner

Key facts

Power plant owner · 150 MW
Assets
1
Registered in
China
Parent
China Energy Investment CorpOwnership claimOwnership link recorded from its source; no date stated by the source.

Assets 1

Assets

1

Capacity

150 MW

MW by fuel
  1. Coal: 150 MW, 1 asset

Owns 1 power plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

16.2 km

Tianjin Northeast power station Phase II Unit 3

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Canceled Tianjin Northeast power station Phase II Unit 3 Coal 350 MW 16.2 km away nearest: Tianjin-1 power station
Canceled Tianjin Northeast power station Phase II Unit 4 Coal 350 MW 16.2 km away nearest: Tianjin-1 power station
Announced Yangliuqing power station Phase V Unit 5 Coal 660 MW 16.2 km away nearest: Tianjin-1 power station
Announced Yangliuqing power station Phase V Unit 6 Coal 660 MW 16.2 km away nearest: Tianjin-1 power station
Canceled Yangliuqing power station Phase V Unit 7 Coal 600 MW 16.2 km away nearest: Tianjin-1 power station
Canceled Junliangcheng power station Phase VI Unit 12 Coal 350 MW 18.0 km away nearest: Tianjin-1 power station
Canceled GreenGen power station Phase II Unit 1 Coal 400 MW 24.1 km away nearest: Tianjin-1 power station
Canceled GreenGen power station Phase II Unit 2 Coal 400 MW 24.1 km away nearest: Tianjin-1 power station

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution