Vector Pipeline Co — Gas pipeline · Vector Pipeline CoMEC South — Gas, combined cycle · MI · 500 MW · 1.2 km awayMEC North — Gas, combined cycle · MI · 500 MW · 1.4 km awayEastern Power Hydrogen Ready Power Plant Project 2 — Gas, combined cycle · Canada · 300 MW · 4.1 km awayEastern Power Hydrogen Ready Power Plant Project 1 — Gas, combined cycle · Canada · 300 MW · 4.1 km awaySt Joseph Energy Center — Gas, combined cycle · IN · 1,406 MW · 6.1 km awaySt. Clair Energy Centre 3 — Gas, combustion turbine · Canada · 245 MW · 13.6 km away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Vector Pipeline Co

Follow this company

Gas pipeline operator

Key facts

Gas pipeline operator · 327 miles
Pipeline and line held
327miles
Assets
1
States
IL, IN, MI
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Gas pipeline: 1 assets, 1 asset

Operates 1 gas pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
Vector Pipeline Co Gas pipeline Operates 327 miles US-IL, US-IN, US-MI Vector Pipeline Co

Around this company

Nearby 6

within 25 km

Projects

6

of 35 before the technology filter

Nearest

1.2 km

MEC South

6 of 35 · gas-related technologiesNearbyShowing 6 of 35 nearby projects, narrowed to gas-related technologies because this company operates gas infrastructure. Show all 35

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed MEC South Gas, combined cycle 500 MW 1.2 km away nearest: Vector Pipeline Co
Permitted MEC North Gas, combined cycle 500 MW 1.4 km away nearest: Vector Pipeline Co
Under construction Eastern Power Hydrogen Ready Power Plant Project 2 Gas, combined cycle 300 MW 4.1 km away nearest: Vector Pipeline Co
Under construction Eastern Power Hydrogen Ready Power Plant Project 1 Gas, combined cycle 300 MW 4.1 km away nearest: Vector Pipeline Co
Postponed St Joseph Energy Center Gas, combined cycle 1,406 MW 6.1 km away nearest: Vector Pipeline Co
Announced St. Clair Energy Centre 3 Gas, combustion turbine 245 MW 13.6 km away nearest: Vector Pipeline Co

Sources EIA-860M · GEM

Sources

Every source and license · Attribution