SC 1 Data Center, Phase 2 — Power plant · Oil · Xeres Ventures LLCSKYBOX DATA CENTER — Built · Large load · CA · 0.4 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 0.8 mi away4054 Digital Realty — Built · Large load · CA · 0.8 mi awayKifer BESS 1 — Under construction · Storage · CA · 50 MW · 1.1 mi awayPRIME DATA CENTERS — Built · Large load · CA · 1.1 mi awayLBA Data Center West — Filed · Large load · CA · 1.5 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 1.7 mi awaySV8 DATA CENTER — Large load · CA · 1.9 mi awayEdgecore -3580 — Filed · Large load · CA · 1.9 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 2.0 mi awayDC-N (San Jose data centre) — Filed · Large load · CA · 2.9 mi awayData Center — Filed · Large load · CA · 3.8 mi awaySJC02 & SJC03 DATA CENTER — Large load · CA · 4.4 mi away888 Ross Data Center — Filed · Large load · CA · 5.6 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 9.0 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 9.7 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 12.2 mi awayCHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER — Large load · CA · 12.4 mi awayEquinix SV-19 - 131 Great Oaks Blvd SJ — Filed · Large load · CA · 12.5 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 14.0 mi away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Xeres Ventures LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 99.6 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2013 to 2026
  • Oil
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearOilTotal (MWh)
2026 (part year)6565
2025380380
20242,1412,141
2023108108
20221,1181,118
2021154154
2020138138
2019236236
2018172172
2017196196
2016186186
2015246246
2014461461
20134242

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

99.6 MW

MW by fuel
  1. Oil: 99.6 MW, 1 asset

Operates 1 power plant

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 20

within 15 mi

Projects

20

within 15 mi

Nearest

0.4 mi

SKYBOX DATA CENTER

All 20NearbyShowing all 20 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Built SKYBOX DATA CENTER Large load — 0.4 mi away nearest: SC 1 Data Center, Phase 2
Filed 1200 Memorex Skybox Data Center Large load — 0.8 mi away nearest: SC 1 Data Center, Phase 2
Built 4054 Digital Realty Large load — 0.8 mi away nearest: SC 1 Data Center, Phase 2
Under construction Kifer BESS 1 Storage 50 MW 1.1 mi away nearest: SC 1 Data Center, Phase 2
Built PRIME DATA CENTERS Large load — 1.1 mi away nearest: SC 1 Data Center, Phase 2
Filed LBA Data Center West Large load — 1.5 mi away nearest: SC 1 Data Center, Phase 2
Unknown VANTAGE DATA CENTERS MANAGEMENT CO , LLC Large load — 1.7 mi away nearest: SC 1 Data Center, Phase 2
Unknown SV8 DATA CENTER Large load — 1.9 mi away nearest: SC 1 Data Center, Phase 2
Filed Edgecore -3580 Large load — 1.9 mi away nearest: SC 1 Data Center, Phase 2
Unknown EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Large load — 2.0 mi away nearest: SC 1 Data Center, Phase 2
Filed DC-N (San Jose data centre) Large load — 2.9 mi away nearest: SC 1 Data Center, Phase 2
Filed Data Center Large load — 3.8 mi away nearest: SC 1 Data Center, Phase 2
Unknown SJC02 & SJC03 DATA CENTER Large load — 4.4 mi away nearest: SC 1 Data Center, Phase 2
Filed 888 Ross Data Center Large load — 5.6 mi away nearest: SC 1 Data Center, Phase 2
Under construction Fremont CA AutoFactory Solar 3.8 MW 9.0 mi away nearest: SC 1 Data Center, Phase 2
Postponed Waste Management Tri-Cities LFGTE Biomass 4.8 MW 9.7 mi away nearest: SC 1 Data Center, Phase 2
Under construction 7999 Gateway Solar Solar 4.6 MW 12.2 mi away nearest: SC 1 Data Center, Phase 2
Unknown CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER Large load — 12.4 mi away nearest: SC 1 Data Center, Phase 2
Filed Equinix SV-19 - 131 Great Oaks Blvd SJ Large load — 12.5 mi away nearest: SC 1 Data Center, Phase 2
Announced Gateway#1&2 (Newark CA) Solar 1.1 MW 14.0 mi away nearest: SC 1 Data Center, Phase 2

Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M · CAISO · EPA ICIS-Air

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Every source and license · Attribution