Show on map
Bakersfield DriverLerdo Middle — Under construction · Solar · CA · 2.4 MW · 4.5 mi awayRanch 4220 — Under construction · Solar · CA · 1.1 MW · 4.7 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 5.2 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 6.7 mi awayNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 7.1 mi awayKern Front — Postponed · Solar · CA · 18.9 MW · 9.6 mi awaySolar Photovoltaic Project #35 — Postponed · Solar · CA · 7 MW · 12.6 mi awaySolar Photovoltaic Project #46 — Postponed · Solar · CA · 3.5 MW · 12.6 mi awayRanch 4701 — Under construction · Solar · CA · 2.3 MW · 14.2 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

Bakersfield Driver

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
2 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
70428 2 generatorsEIA generatorsPlant 70428 DRIVB, DRIVS

Timeline

  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
  • Stated In-service date stated by EIA-860M.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lerdo Middle Under construction Solar 4.5 mi 2.4
Ranch 4220 Under construction Solar 4.7 mi 1.1
Imperator Solar Under construction Solar 5.2 mi 2
North Kern Water Storage District 1 Postponed Solar 6.7 mi 2.5
North Kern Water Storage District 2 Postponed Solar 7.1 mi 2.5
Kern Front Postponed Solar 9.6 mi 18.9
Solar Photovoltaic Project #35 Postponed Solar 12.6 mi 7
Solar Photovoltaic Project #46 Postponed Solar 12.6 mi 3.5
Ranch 4701 Under construction Solar 14.2 mi 2.3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution