Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Lerdo Middle: the source's site coordinate and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Lerdo Middle
Solar
Key facts
Solar Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- Wonderful Renewable Energy, LLC.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 70372 generator LERMI
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-08-01 → 2026-09-01.
- Stated In-service date stated by EIA-860M.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Imperator Solar Under construction | Solar | 0.9 mi | 2 |
| North Kern Water Storage District 1 Postponed | Solar | 2.6 mi | 2.5 |
| North Kern Water Storage District 2 Postponed | Solar | 2.7 mi | 2.5 |
| Bakersfield Driver Under construction | Solar + storage | 4.5 mi | 2 |
| Kern Front Postponed | Solar | 6.8 mi | 18.9 |
| Ranch 4220 Under construction | Solar | 7.0 mi | 1.1 |
Sources EIA-860M