Show on map
Kern FrontLerdo Middle — Solar · CA · 2.4 MW · 11.0 km awayNorth Kern Water Storage District 2 — Solar · CA · 2.5 MW · 11.4 km awayImperator Solar — Solar · CA · 2 MW · 11.5 km awayNorth Kern Water Storage District 1 — Solar · CA · 2.5 MW · 12.6 km awayRanch 4220 — Solar · CA · 1.1 MW · 13.4 km awayBakersfield Driver — Solar + storage · CA · 2 MW · 15.5 km awayBolthouse Farms Fuel Cell — Gas, other · CA · 5 MW · 20.4 km away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Kern County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
67691 generator 731

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Lerdo Middle Under construction Solar 11.0 km 2.4
North Kern Water Storage District 2 Postponed Solar 11.4 km 2.5
Imperator Solar Under construction Solar 11.5 km 2
North Kern Water Storage District 1 Postponed Solar 12.6 km 2.5
Ranch 4220 Under construction Solar 13.4 km 1.1
Bakersfield Driver Under construction Solar + storage 15.5 km 2
Bolthouse Farms Fuel Cell Postponed Gas, other 20.4 km 5

Sources EIA-860M

Sources

Attribution