Free email alerts →
Capacity (MW)
Status: active
Show projects that are

Always included while Built, Withdrawn, Status unknown or Postponed is ticked.

5 projects

Active only

What this view shows

Showing 5 active projects (announced to under construction). Hidden: 0 withdrawn or canceled.

Save this search as an alert Free, daily or weekly.

Projects matching the current filters, sorted by capacity, largest first by default.
Status Name. Sort by name, A to Z Technology Capacity (MW), sorted descending. Sort by capacity, smallest first Location Company Proposed online. Sort by proposed online date, latest first Source
Filed (source status: Scoping) Marram Wind Offshore Wind Farm Offshore wind 3,000 MW Longside 400kV Substation, United KingdomMarramwind Limited Online Oct 31, 2033 NESO
Studied (source status: Awaiting Consents) Muir Mhor Offshore Wind Farm Offshore wind 1,000 MW Longside 400kV Substation, United KingdomMUIR MHÒR Offshore Wind Farm Limited Online Oct 31, 2033 NESO
Filed (source status: Scoping) Broadshore Offshore Wind Farm Offshore wind 900 MW Longside 400kV Substation, United KingdomBroadshore Offshore Wind Farm Limited Online Oct 31, 2033 NESO
Filed (source status: Scoping) Netherton BESS Storage 400 MW Longside 400kV Substation, United KingdomHarmony Energy Limited Online Oct 31, 2033 NESO
Filed (source status: Scoping) Netherton Hub Bess Storage 200 MW Longside 400kV Substation, United KingdomField Netherton Ltd Online Oct 31, 2033 NESO

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 18, 2026Supported by National Energy SO Open Data

Attribution