Projects in development
Supply side: grid queues, permits and planned plants · Suggest a missing project
Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)
Status not current
The status is the one the file states on that date, not the register’s current one.
Save this search as an alert Free, daily or weekly.
| Status | Name. Sort by name, A to Z | Technology | Capacity (MW), sorted descending. Sort by capacity, smallest first | Location | Company | Proposed online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|---|
| Filed (source status: Scoping) | Bute Hydrogen Project 1 | Gas, combined cycle | 4,800 MW | Trent Valley South Connection Node D 400kV Substation, United Kingdom | Haldane Energy Project 1 Limited | Online Oct 30, 2035 | NESO |
| Filed (source status: Scoping) | Drax BECCS | Biomass | 3,906 MW | Drax 400kV Substation, United Kingdom | Drax Power Limited | Online Oct 30, 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 6 | Gas, combined cycle | 3,600 MW | Cheshire Connection Node A 400kV Substation, United Kingdom | Haldane Energy Project 6 Limited | Online Oct 30, 2037 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 5 | Gas, combined cycle | 3,600 MW | Teeside Connection Node B, United Kingdom | Haldane Energy Project 5 Limited | Online Oct 31, 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 3 | Gas, combined cycle | 3,600 MW | Grimsby West 400kV Substation, United Kingdom | Haldane Energy Project 3 Limited | Online Oct 30, 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 2 | Gas, combined cycle | 3,600 MW | Creyke Beck 400kV Substation, United Kingdom | Haldane Energy Project 2 Limited | Online Oct 30, 2035 | NESO |
| Filed (source status: Scoping) | Hinkley Point C | Nuclear | 3,340 MW | Shurton 400kV Substation, United Kingdom | NNB Generation Company (HPC) Limited | Online Mar 31, 2029 | NESO |
| Filed (source status: Scoping) | Marram Wind Offshore Wind Farm | Offshore wind | 3,000 MW | Longside 400kV Substation, United Kingdom | Marramwind Limited | Online Oct 31, 2033 | NESO |
| Filed (source status: Scoping) | Hornsea Power Station 4 | Offshore wind | 2,600 MW | Creyke Beck 400kV Substation, United Kingdom | Orsted Hornsea Project Four Limited | Online Oct 30, 2028 | NESO |
| Filed (source status: Scoping) | Portwind | Solar + storage | 2,500 MW | Chickerell 400kV Substation, United Kingdom | SE Portwind Ltd | Online Dec 6, 2036 | global.gem.gipt |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Pepper Hammock Solar and Storage | Solar + storage | 2,500 MW | Wayne, GA | BrightNight Power | Online Sep 1, 2029 | EIA-860M |
| Filed (source status: Scoping) | Bute Hydrogen Project 7.1 | Storage | 2,400 MW | Solent Connection Node C 400kV, United Kingdom | Haldane Energy Project 7 Limited | Online Oct 31, 2038 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 4 | Gas, combined cycle | 2,400 MW | Teeside Connection Node 2 C 132/400kV Substation, United Kingdom | Haldane Energy Project 4 Limited | Online Oct 30, 2035 | NESO |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Sunstone Solar | Solar + storage | 2,400 MW | Morrow, OR | Sunstone Solar, LLC | Online Dec 1, 2027 | EIA-860M |
| Filed (source status: Scoping) | OWPL Windfarm | Offshore wind | 2,250 MW | Banniskirk 400kV Substation, United Kingdom | Offshore Wind Power Limited | Online Dec 31, 2030 | NESO |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3996 | Gas, other | 2,220 MW | St. Charles, MO | — | Online Jan 1, 2030 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Walpole Flexible Generation | Gas, combined cycle | 2,000 MW | Walpole 400kV Substation, United Kingdom | Flexible Generation 1 Ltd | Online Jun 30, 2033 | NESO |
| Filed (source status: Scoping) | Machair Offshore Wind Farm | Offshore wind | 2,000 MW | Machair 275/66kV Offshore Substation, United Kingdom | ScottishPower Renewables (UK) Limited | Online Sep 16, 2033 | NESO |
| Filed (source status: Scoping) | Gallos | Offshore wind | 2,000 MW | Alverdiscott 400kV Substation, United Kingdom | Corio Generation | Online Dec 6, 2036 | NESO |
| Filed (source status: Scoping) | Caledonia Offshore Wind Farm | Offshore wind | 2,000 MW | Greens 400kV Substation, United Kingdom | Caledonia Offshore Wind Farm Limited | Online Oct 31, 2032 | NESO |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Deschutes Solar and BESS | Solar + storage | 2,000 MW | Wasco, OR | DECH bn, LLC | Online Nov 1, 2029 | EIA-860M |
| Filed (source status: Scoping) | North-East Offshore Hybrid Asset | Offshore wind | 1,800 MW | Kintore GSP, United Kingdom | National Grid Interconnector Holdings Limited | Online Jun 30, 2037 | NESO |
| Filed (source status: Scoping) | Glen Earrach PSH | Pumped hydro storage | 1,800 MW | Glen Earrach PSH 400kV substation, United Kingdom | Glen Earrach Energy Limited | Online Oct 31, 2035 | NESO |
| Filed (source status: Scoping) | Carrington Lane BESS | Storage | 1,800 MW | Daines 400kV Substation, United Kingdom | Apatura Battery Ltd | Online Oct 30, 2037 | NESO |
| Filed (source status: Scoping) | Berwick Bank Offshore Wind Farm C | Offshore wind | 1,800 MW | Blyth 400kV Substation, United Kingdom | Berwick Bank C Limited | Online Nov 30, 2029 | NESO |
| Filed (source status: Scoping) | Bellrock Offshore Wind Farm | Offshore wind | 1,800 MW | Hurlie 400kV substation, United Kingdom | Bellrock Offshore Wind Farm Limited | Online Oct 31, 2032 | NESO |
| Filed (source status: Scoping) | ARVEN OFFSHORE WIND FARM | Offshore wind | 1,800 MW | Northern Shetland 400kV Substation, United Kingdom | Arven Offshore Wind Farm Limited | Online Oct 31, 2033 | global.gem.gipt |
| Filed (source status: Scoping) | NatPower Enderby - Patford Bridge Green Energy Park | Storage | 1,799 MW | Derbyshire Connection Node G 400kV, United Kingdom | Enderby Energy Limited | Online Oct 30, 2037 | NESO |
| Filed (source status: Scoping) | Springwell | Solar + storage | 1,600 MW | Navenby 400kV Substation, United Kingdom | Springwell Energyfarm Limited | Online Jun 1, 2033 | global.gem.gipt |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3999 | Gas, other | 1,540 MW | Vermillion, IN | — | Online Jan 2, 2030 | us.lbnl.queued_up |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Bison Generation Station | Gas, combined cycle | 1,518 MW | Williams, ND | Basin Electric Power Coop | Online Feb 1, 2029 | EIA-860M |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4071 | Gas, other | 1,500 MW | Livingston Parish, LA | — | Online Jun 30, 2030 | us.lbnl.queued_up |
| Filed (source status: suspended) | Q320 | Wind | 1,500 MW | San Juan, NM | — | Online Sep 30, 2026 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Torridge Offshore Wind Farm | Offshore wind | 1,500 MW | Torridge Offshore Substation, United Kingdom | Gwynt GLAS Offshore Wind Farm Limited | Online Oct 31, 2031 | NESO |
| Filed (source status: Scoping) | Stromar Offshore Windfarm | Offshore wind | 1,500 MW | Greens 400kV Substation, United Kingdom | Stromar Offshore Wind Farm Limited | Online Oct 31, 2033 | NESO |
| Filed (source status: Scoping) | SSE Celtic Sea 1 | Offshore wind | 1,500 MW | Alverdiscott 400kV Substation, United Kingdom | SSE Renewables Offshore Windfarm Holdings Limited | Online Dec 6, 2036 | NESO |
| Filed (source status: Scoping) | Phoenix 1B Offshore Wind Farm | Offshore wind | 1,500 MW | Near Branxton 400kV Substation, United Kingdom | Morven Offshore Wind Limited | Online Oct 31, 2033 | NESO |
| Filed (source status: Scoping) | Old Flatts Farm | Solar + storage | 1,500 MW | Brinsworth 400kV Substation, United Kingdom | Net Zero One Ltd | Online Oct 30, 2029 | NESO |
| Filed (source status: Scoping) | Nursling Flexible Generation | Gas, combined cycle | 1,500 MW | Nursling 400kV Substation, United Kingdom | South ENG Flexible Generation Limited | Online Oct 30, 2038 | NESO |
| Filed (source status: Scoping) | Morven A Offshore Wind Farm (Prev Phoenix 1A) | Offshore wind | 1,500 MW | Hawthorn Pit 400kV Substation, United Kingdom | Morven Offshore Wind Limited | Online Oct 31, 2031 | NESO |
| Filed (source status: Scoping) | Morgan Offshore Wind Farm | Offshore wind | 1,500 MW | Penwortham 400kV Substation, United Kingdom | Morgan Offshore Wind Limited | Online Nov 30, 2029 | global.gem.gipt |
| Filed (source status: Scoping) | Mona Offshore Wind Farm | Offshore wind | 1,500 MW | Bodelwyddan 400kV Substation, United Kingdom | Mona Offshore Wind Limited | Online Oct 31, 2029 | NESO |
| Filed (source status: Scoping) | Merlin 2 Offshore Windfarm | Offshore wind | 1,500 MW | Alverdiscott 400kV Substation, United Kingdom | Offshore Wind Limited | Online Oct 31, 2031 | NESO |
| Filed (source status: Scoping) | Mablethorpe Storage | Gas, combined cycle | 1,500 MW | Lincolnshire Coastal Node 400kV Substation, United Kingdom | Theddlethorpe Flexible Generation Limited | Online Nov 30, 2031 | NESO |
| Filed (source status: Scoping) | Havbredey | Offshore wind | 1,500 MW | New Dounreay 400kV substation, United Kingdom | Havbredey Limited | Online Oct 30, 2033 | NESO |
| Filed (source status: Scoping) | GT R4 Offshore Wind Farm | Offshore wind | 1,500 MW | Weston Marsh 400kV Substation, United Kingdom | GT R4 Limited | Online Nov 30, 2030 | NESO |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4024 | Gas, other | 1,499 MW | Monroe, MI | — | Online Sep 30, 2030 | us.lbnl.queued_up |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4025 | Gas, other | 1,499 MW | Monroe, MI | — | Online Sep 30, 2030 | us.lbnl.queued_up |
| Filed (source status: active) (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3799 | Gas, other | 1,452 MW | Livingston, MI | — | Online Apr 1, 2030 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Dogger Bank South West | Offshore wind | 1,450 MW | Birkhill Wood 400kV Substation, United Kingdom | RWE Renewables UK Dogger Bank South (West) Limited | Online Nov 30, 2031 | NESO |
Sources NESO · GEM · EIA-860M · Berkeley Lab
Supported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.