Show on map
ALON BAKERSFIELD PROPERTY INC, BAKERSFIELD — Petroleum product terminalNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 7.4 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 8.0 mi awayBolthouse Farms Fuel Cell — Postponed · Gas, other · CA · 5 MW · 8.4 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 9.2 mi awayKern Front — Postponed · Solar · CA · 18.9 MW · 9.3 mi awayLerdo Middle — Under construction · Solar · CA · 2.4 MW · 9.9 mi awayBakersfield Driver — Under construction · Solar + storage · CA · 2 MW · 14.4 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

ALON Bakersfield Property Inc, Bakersfield

Petroleum product terminal

As filed: ALON BAKERSFIELD PROPERTY INC, BAKERSFIELD

Key facts

Petroleum product terminal Operating
Location
California

Details

Who’s behind it

Owner
ALON Bakersfield Property IncSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd5
SiteBAKERSFIELD
SurveyEIA-815
Owner, as the source states itALON BAKERSFIELD PROPERTY INC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
North Kern Water Storage District 2 Postponed Solar 7.4 mi 2.5
North Kern Water Storage District 1 Postponed Solar 8.0 mi 2.5
Bolthouse Farms Fuel Cell Postponed Gas, other 8.4 mi 5
Imperator Solar Under construction Solar 9.2 mi 2
Kern Front Postponed Solar 9.3 mi 18.9
Lerdo Middle Under construction Solar 9.9 mi 2.4
Bakersfield Driver Under construction Solar + storage 14.4 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution