Show on map
Alta Wind XI — Power plant · Wind · Alta Wind XI, LLCTehachapi Wind Resource I — Postponed · Wind · CA · 0.6 MW · 0.3 mi away4001 and 2510 ClearVista Solar and Wind — Withdrawn · Wind · CA · 24.5 MW · 2.9 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 7.7 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 9.1 mi awayCamino Solar Hybrid — Postponed · Storage · CA · 11 MW · 9.8 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 11.1 mi awayRosamond South II — Under construction · Storage · CA · 140 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Alta Wind XI

Power plant · Wind

Key facts

Power plant · Windran 32% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
250,622 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
Kern County, California

Output

Net generation MWh by year, 2014 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
12 years since 2014
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025855,122
Capacity factor, 20250.318
Net generation (MWh), 2025250,622
Balancing authority codeCISO

Wind turbines

Turbines
52
Turbine capacity (MW)
99.9
Turbine models
42 GE Wind GE1.7-100 and 10 GE Wind GE2.85-103
Hub height (m)
80–85
Rotor diameter (m)
100–103
Year online
2013

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Alta Wind XI, LLC Operator EIA-860M
NRG Renew Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tehachapi Wind Resource I Postponed Wind 0.3 mi 0.6
4001 and 2510 ClearVista Solar and Wind Withdrawn Wind 2.9 mi 24.5
Windhub Solar B, LLC Under construction Solar 7.7 mi 26.4
Syracuse and Tours Renewable Energy Permitted Solar + storage 9.1 mi 80
Camino Solar Hybrid Postponed Storage 9.8 mi 11
Tehachapi Spindle Withdrawn Storage 11.1 mi 20
Rosamond South II Under construction Storage 14.9 mi 140

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO

Attribution