Show on map
Arthur Kill Generating Station — Power plant · Gas, steam turbine · Arthur Kill Power LLCElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 0.1 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 0.9 mi awayPrologis - SLNNJ036 - Community Solar — Under construction · Solar · NJ · 1.6 MW · 5.2 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 5.8 mi awayStaten Island Energy Storage 1 LLC — Postponed · Storage · NY · 5 MW · 5.9 mi awayElizabeth Metropolitan Logistics Center — Under construction · Solar · NJ · 1.2 MW · 6.4 mi awayBPL NJ - Union Distribution Center — Under construction · Solar · NJ · 1.5 MW · 6.7 mi awayCoreweave — Under construction · Large load · NJ · 7.0 mi awayBayonne Energy Center — Under construction · Storage · NJ · 49.8 MW · 7.1 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 7.4 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 10.0 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 10.1 mi awayGowanus Gas Turbines Generating — Postponed · Gas, combustion turbine · NY · 93 MW · 11.4 mi awayNJ TRANSITGRID — Postponed · Gas, combustion turbine · NJ · 136.1 MW · 12.2 mi awayGateway Energy Center, LLC — Postponed · Gas, combined cycle · NJ · 440 MW · 12.8 mi awayMiddlesex Energy Center LLC — Postponed · Gas, combined cycle · NJ · 570 MW · 13.0 mi awayCDIL DATA CENTRE USA LLC — Built · Large load · NY · 13.3 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 13.8 mi awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Built · Large load · NJ · 13.9 mi awayHeron Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 14.2 mi awayBensonhurst Energy Storage 1 LLC — Under construction · Storage · NY · 5 MW · 14.3 mi awayCORESITE NY4 DATA CENTER — Under construction · Large load · NJ · 14.3 mi awayNISA Electric Generation Project — Permitted · Storage · NY · 300 MW · 14.4 mi awayNISA Electric Generation Project — Postponed · Gas, combined cycle · NY · 92.5 MW · 14.4 mi awayJamaica Community Energy, LLC — Under construction · Storage · NY · 4.9 MW · 14.6 mi awayEQUINIX LLC — Built · Large load · NJ · 14.6 mi awayEQUINIX — Built · Large load · NJ · 14.6 mi awayCYXTERA - NJ2X — Built · Large load · NJ · 14.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Arthur Kill Generating Station

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1959
Net generation, 2025
2,056,487 MWh
Grid
345 kV, 138 kV to Consolidated Edison Co-NY Inc (NYIS)
Location
Richmond County, New York

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
67 years since 1959
Unused energy
5,631 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,573 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000866386
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000759
Fuel burned (MMBtu), 202521,743,777
Capacity factor, 20250.268
Heat rate (Btu/kWh), 202510,573.3
Net generation (MWh), 20252,056,487
Balancing authority codeNYIS

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
18 MW
Generators retired
1
Capacity still in service
877.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GT1Natural Gas Fired Combustion Turbine18 MWRetiredMay 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV, 138 kV
Transmission or distribution system owner
Consolidated Edison Co-NY Inc
Balancing authority
New York Independent System Operator
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Arthur Kill Power LLC Operator EIA-860M
ARCLIGHT ENERGY PARTNERS FUND VII LP Owner 100.0% Dec 31, 2023 EPA GHGRP
Arthur Kill Power LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit GT1 scheduled to retire, 18 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elevate Arthur Kill Under construction Storage 0.1 mi 15.1
Swiftsure Postponed Storage 0.9 mi 121
Prologis - SLNNJ036 - Community Solar Under construction Solar 5.2 mi 1.6
BARCLAYS CAPITAL DATA CENTER Built Large load 5.8 mi
Staten Island Energy Storage 1 LLC Postponed Storage 5.9 mi 5
Elizabeth Metropolitan Logistics Center Under construction Solar 6.4 mi 1.2
BPL NJ - Union Distribution Center Under construction Solar 6.7 mi 1.5
Coreweave Under construction Large load 7.0 mi
Bayonne Energy Center Under construction Storage 7.1 mi 49.8
AB Newark Solar Postponed Solar 7.4 mi 5.6
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 10.0 mi
Gowanus Gas Turbines Generating Postponed Gas, combustion turbine 11.4 mi 93
NJ TRANSITGRID Postponed Gas, combustion turbine 12.2 mi 136.1
Gateway Energy Center, LLC Postponed Gas, combined cycle 12.8 mi 440
Middlesex Energy Center LLC Postponed Gas, combined cycle 13.0 mi 570
CDIL DATA CENTRE USA LLC Built Large load 13.3 mi
BARCLAYS CAPITAL DATA CENTER Built Large load 13.8 mi
EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built Large load 13.9 mi
Heron Clean Energy, LLC Under construction Storage 14.2 mi 4.9
Bensonhurst Energy Storage 1 LLC Under construction Storage 14.3 mi 5
CORESITE NY4 DATA CENTER Under construction Large load 14.3 mi
NISA Electric Generation Project × 2 units Permitted Storage 14.4 mi 392.5
Jamaica Community Energy, LLC Under construction Storage 14.6 mi 4.9
EQUINIX LLC Built Large load 14.6 mi
EQUINIX Built Large load 14.6 mi
CYXTERA - NJ2X Built Large load 14.8 mi

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution