- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
Astoria Gas Turbines: location and 39 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Astoria Gas Turbines
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2025
- 0 MWh
- Location
- Queens County, New York
- Operated by
- NRG Astoria Gas Turbine Operations Inc
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- NRG Energy, Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 56 years since 1970
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | NYIS |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2023
- First unit retired
- December 2002
- Capacity retired
- 666.1 MW
- Generators retired
- 20
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 9 | Petroleum Liquids | 19.2 MW | Retired | December 2002 |
| 10 | Petroleum Liquids | 23.8 MW | Retired | October 2018 |
| 8 | Petroleum Liquids | 16.3 MW | Retired | October 2018 |
| 12 | Petroleum Liquids | 23.8 MW | Retired | December 2018 |
| 13 | Petroleum Liquids | 23.8 MW | Retired | December 2018 |
| 5 | Petroleum Liquids | 16.3 MW | Retired | December 2018 |
| 7 | Petroleum Liquids | 16.3 MW | Retired | December 2018 |
| 11 | Petroleum Liquids | 23.8 MW | Retired | May 2019 |
| 2-1 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 2-2 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 2-3 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 2-4 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 3-1 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 3-2 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 3-3 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 3-4 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 4-1 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 4-2 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 4-3 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
| 4-4 | Natural Gas Fired Combustion Turbine | 41.9 MW | Retired | May 2023 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Fired Combustion Turbine | 502.8 MW | |
| Petroleum Liquids | 163.3 MW |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- NYIS
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| NRG Astoria Gas Turbine Operations Inc | Operator | EIA-860M | ||
| NRG Energy, Inc | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 2-1, 2-2, 2-3, 2-4, 3-1, 3-2, 3-3, 3-4, 4-1, 4-2, 4-3, 4-4 scheduled to retire, 502.8 MW · EIA-860M
- Stated Unit 11 scheduled to retire, 23.8 MW · EIA-860M
- Stated Units 12, 13, 5, 7 scheduled to retire, 80.2 MW · EIA-860M
- Stated Units 10, 8 scheduled to retire, 40.1 MW · EIA-860M
- Stated Unit 9 scheduled to retire, 19.2 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Astoria Gas Turbines unit CTG01 Postponed | Gas, combustion turbine | 0.0 mi | 431 |
| New York University Central Plant Under construction | Gas, combined cycle | 1.0 mi | 5.5 |
| Wintergreen C Clean Energy LLC Under construction | Storage | 1.9 mi | 4.9 |
| Wintergreen B Clean Energy LLC Under construction | Storage | 1.9 mi | 4.9 |
| Wintergreen D Clean Energy LLC Under construction | Storage | 1.9 mi | 4.9 |
| Wintergreen Clean Energy, LLC Under construction | Storage | 1.9 mi | 4.9 |
| Lincoln Medical and Mental Health Center Under construction | Oil | 2.3 mi | 1 |
| Ravenswood Postponed | Storage | 2.9 mi | 316 |
| Warbler Clean Energy LLC Under construction | Storage | 3.0 mi | 2.3 |
| Piping Plover Clean Energy, LLC Under construction | Storage | 3.0 mi | 2.3 |
| Lobelia Clean Energy LLC Under construction | Storage | 4.6 mi | 4.9 |
| Lobelia 4452 Clean Energy LLC Under construction | Storage | 4.6 mi | 4.9 |
| Roseate Tern Clean Energy LLC Under construction | Storage | 5.0 mi | 3.3 |
| NISA Electric Generation Project × 2 units Permitted | Storage | 6.5 mi | 392.5 |
| CYXTERA - NJ2X Built | Large load | 6.6 mi | |
| CDIL DATA CENTRE USA LLC Built | Large load | 7.2 mi | |
| Blue Aster B Clean Energy LLC Under construction | Storage | 7.8 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Storage | 7.8 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Storage | 7.8 mi | 4.9 |
| Eastern BlueBird Clean Energy LLC Under construction | Storage | 7.8 mi | 4.4 |
| Northern Cardinal Clean Energy, LLC Under construction | Storage | 7.8 mi | 4.4 |
| Water Willow A Clean Energy LLC Under construction | Storage | 8.5 mi | 3.9 |
| Water Willow B Clean Energy LLC Under construction | Storage | 8.5 mi | 3.9 |
| EQUINIX Built | Large load | 8.5 mi | |
| CORESITE NY4 DATA CENTER Under construction | Large load | 8.5 mi | |
| Linden Clean Energy, LLC Under construction | Storage | 8.7 mi | 3.7 |
| Coral Honeysuckle Clean Energy LLC Under construction | Storage | 8.7 mi | 3.7 |
| EQUINIX LLC Built | Large load | 8.7 mi | |
| Gowanus Gas Turbines Generating Postponed | Gas, combustion turbine | 10.0 mi | 93 |
| NJ TRANSITGRID Postponed | Gas, combustion turbine | 10.1 mi | 136.1 |
| Jamaica Community Energy, LLC Under construction | Storage | 10.4 mi | 4.9 |
| Bensonhurst Energy Storage 1 LLC Under construction | Storage | 10.5 mi | 5 |
| Heron Clean Energy, LLC Under construction | Storage | 11.8 mi | 4.9 |
| Kennedy International Airport Cogen Postponed | Gas, combustion turbine | 12.0 mi | 50 |
| CLIFTON DATA CENTER Built | Large load | 12.7 mi | |
| RAR DEVELOPMENT ASSOCIATES × 2 units Built | Large load | 13.0 mi | |
| Bayonne Energy Center Under construction | Storage | 13.5 mi | 49.8 |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES