Show on map
Blueberry One — Power plant · Solar · Cypress Creek RenewablesStevens Mill Solar — Filed · Solar · NC · 80 MW · 3.5 mi awayRoady Lane Farm LLC — Postponed · Solar · NC · 74.8 MW · 5.2 mi awayBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 5.3 mi awaySadie Solar — Postponed · Solar · NC · 5 MW · 9.2 mi awayLongleaf Solar — Postponed · Solar · NC · 5 MW · 9.5 mi awaySignature Solar — Postponed · Solar · NC · 5 MW · 10.4 mi awayCalypso Farm — Postponed · Solar · NC · 5 MW · 11.3 mi awayPanther Branch Solar, LLC — Filed · Solar + storage · NC · 112 MW · 11.6 mi awayFaison Farm — Postponed · Solar · NC · 5 MW · 13.2 mi awayFibroCoast — Postponed · Biomass · NC · 60 MW · 13.5 mi awayWilfork Solar — Postponed · Solar · NC · 5 MW · 14.9 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Blueberry One

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
9,213 MWh
Grid
23 kV to Duke Energy Carolinas, LLC (DUK)
Location
Wayne County, North Carolina
Operated by
Cypress Creek RenewablesSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814756
Location id
L100000812150
Eia plant ids
58605
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202531,435
Capacity factor, 20250.210
Net generation (MWh), 20259,213
Balancing authority codeDUK

Solar array

Array area (acres)
21.4
AC capacity (MW)
5
DC capacity (MW)
6.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Stevens Mill Solar Filed Solar 3.5 mi 80
Roady Lane Farm LLC Postponed Solar 5.2 mi 74.8
Bradley Farm (Dudley) Postponed Solar 5.3 mi 5
Sadie Solar Postponed Solar 9.2 mi 5
Longleaf Solar Postponed Solar 9.5 mi 5
Signature Solar Postponed Solar 10.4 mi 5
Calypso Farm Postponed Solar 11.3 mi 5
Panther Branch Solar, LLC Filed Solar + storage 11.6 mi 112
Faison Farm Postponed Solar 13.2 mi 5
FibroCoast Postponed Biomass 13.5 mi 60
Wilfork Solar Postponed Solar 14.9 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution