Broadway (CA)
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 2% of 2016 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1955
- Net generation, 2016
- 25,680 MWh
- Grid
- 34 kV to City of Pasadena - (CA) (CISO)
- Location
- Los Angeles County, California
- Operated by
- City of Pasadena - (CA)
Output
- Gas
Details
Who’s behind it
- Owner
- City of Pasadena
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 71 years since 1955
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2016
- First unit retired
- December 2002
- Capacity retired
- 167 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| B1 | Natural Gas Steam Turbine | 46 MW | Retired | December 2002 |
| B2 | Natural Gas Steam Turbine | 46 MW | Retired | December 2002 |
| B3 | Natural Gas Steam Turbine | 75 MW | Retired | December 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 34 kV
- Transmission or distribution system owner
- City of Pasadena - (CA)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Pasadena - (CA) | Operator | EIA-860M | ||
| CITY OF PASADENA | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit B3 scheduled to retire, 75 MW · EIA-860M
- Stated Units B1, B2 scheduled to retire, 92 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Glenarm BESS Plant Filed | Storage | 0.2 km | 25 |
| California Institute of Technology Postponed | Gas, combined cycle | 2.5 km | 16.5 |
| Scholl Canyon Under construction | Biomass | 5.4 km | 12 |
| LATTC South Campus Solar Postponed | Solar | 15.2 km | 1.1 |
| CPA 3777 Workman Postponed | Solar | 15.3 km | 1.9 |
| PRIME DATA CENTER VERNON Built | Large load | 15.8 km | |
| Bandini - SLLAX710 Under construction | Solar | 15.8 km | 1.3 |
| Gabriel Under construction | Storage | 16.5 km | 400 |
| Marici Under construction | Storage | 22.7 km | 400 |
| Foothill Solar Project Postponed | Solar | 24.5 km | 1.1 |