Broadway (CA) — Power plant · Gas, steam turbine · City of Pasadena - (CA)Glenarm BESS Plant — Storage · CA · 25 MW · 0.2 km awayCalifornia Institute of Technology — Gas, combined cycle · CA · 16.5 MW · 2.5 km awayScholl Canyon — Biomass · CA · 12 MW · 5.4 km awayLATTC South Campus Solar — Solar · CA · 1.1 MW · 15.2 km awayCPA 3777 Workman — Solar · CA · 1.9 MW · 15.3 km awayPRIME DATA CENTER VERNON — Large load · CA · 15.8 km awayBandini - SLLAX710 — Solar · CA · 1.3 MW · 15.8 km awayGabriel — Storage · CA · 400 MW · 16.5 km awayMarici — Storage · CA · 400 MW · 22.7 km awayFoothill Solar Project — Solar · CA · 1.1 MW · 24.5 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Broadway (CA)

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 2% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1955
Net generation, 2016
25,680 MWh
Grid
34 kV to City of Pasadena - (CA) (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2016
Fuel burned MMBtu by year, 2001 to 2016
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
71 years since 1955
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002053161
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001458
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2016
First unit retired
December 2002
Capacity retired
167 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
B1Natural Gas Steam Turbine46 MWRetiredDecember 2002
B2Natural Gas Steam Turbine46 MWRetiredDecember 2002
B3Natural Gas Steam Turbine75 MWRetiredDecember 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
City of Pasadena - (CA)
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Pasadena - (CA) Operator EIA-860M
CITY OF PASADENA Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit B3 scheduled to retire, 75 MW · EIA-860M
  • Stated Units B1, B2 scheduled to retire, 92 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Glenarm BESS Plant Filed Storage 0.2 km 25
California Institute of Technology Postponed Gas, combined cycle 2.5 km 16.5
Scholl Canyon Under construction Biomass 5.4 km 12
LATTC South Campus Solar Postponed Solar 15.2 km 1.1
CPA 3777 Workman Postponed Solar 15.3 km 1.9
PRIME DATA CENTER VERNON Built Large load 15.8 km
Bandini - SLLAX710 Under construction Solar 15.8 km 1.3
Gabriel Under construction Storage 16.5 km 400
Marici Under construction Storage 22.7 km 400
Foothill Solar Project Postponed Solar 24.5 km 1.1

Sources EIA-860M · EPA ICIS-NPDES · CAISO

Sources

Attribution