Caltech Central — Power plant · Gas, other · Bloom Energy 2009 PPACalifornia Institute of Technology — Gas, combined cycle · CA · 16.5 MW · 0.3 km awayGlenarm BESS Plant — Storage · CA · 25 MW · 2.1 km awayScholl Canyon — Biomass · CA · 12 MW · 6.5 km awayGabriel — Storage · CA · 400 MW · 14.7 km awayCPA 3777 Workman — Solar · CA · 1.9 MW · 15.1 km awayBandini - SLLAX710 — Solar · CA · 1.3 MW · 16.9 km awayLATTC South Campus Solar — Solar · CA · 1.1 MW · 17.4 km awayPRIME DATA CENTER VERNON — Large load · CA · 17.8 km awayMarici — Storage · CA · 400 MW · 21.9 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Caltech Central

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 80% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
7,729 MWh
Grid
4 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California
Operated by
Bloom Energy 2009 PPASourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2010 to 2025
Fuel burned MMBtu by year, 2010 to 2025
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
16 years since 2010
Heat rate
6,852 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 202552,959
Capacity factor, 20250.802
Heat rate (Btu/kWh), 20256,852
Net generation (MWh), 20257,729
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
March 2031
Capacity scheduled to retire
1.1 MW
Generators scheduled to retire
11
Share of in-service capacity scheduled
100%
Capacity still in service
1.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CL00Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL01Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL02Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL03Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL04Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL05Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL06Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL07Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL08Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL09Other Natural Gas0.1 MWScheduled to retireMarch 2031
CL10Other Natural Gas0.1 MWScheduled to retireMarch 2031

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
4 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units CL00, CL01, CL02, CL03, CL04, CL05, CL06, CL07, CL08, CL09, CL10 scheduled to retire, 1.1 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
California Institute of Technology Postponed Gas, combined cycle 0.3 km 16.5
Glenarm BESS Plant Filed Storage 2.1 km 25
Scholl Canyon Under construction Biomass 6.5 km 12
Gabriel Under construction Storage 14.7 km 400
CPA 3777 Workman Postponed Solar 15.1 km 1.9
Bandini - SLLAX710 Under construction Solar 16.9 km 1.3
LATTC South Campus Solar Postponed Solar 17.4 km 1.1
PRIME DATA CENTER VERNON Built Large load 17.8 km
Marici Under construction Storage 21.9 km 400

Sources EIA-860M · CAISO · EPA ICIS-NPDES