Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Connecticut: route and 21 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Connecticut
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-CT, US-MA
- Operated by
- Buckeye PartnersSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 78
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | BUCKEYE PARTNERS |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | Connecticut |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Windsor Locks Under construction | Solar | 0.5 mi | 1.8 |
| Stony Brook Postponed | Gas, combined cycle | 0.6 mi | 422 |
| Palmer Renewable Energy Postponed | Biomass | 0.6 mi | 42 |
| CT Airport Authority Solar One Announced | Solar | 0.7 mi | 4 |
| NU - WETHERSFIELD DATA CENTER Built | Large load | 1.4 mi | |
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 1.7 mi | 11.5 |
| Ellington Solar One Postponed | Solar | 2.3 mi | 2 |
| Dollar Tree Solar One Postponed | Solar | 2.4 mi | 2 |
| Riverside Holyoke Postponed | Hydro | 2.5 mi | 1.1 |
| Chicopee BESS Under construction | Storage | 3.1 mi | 5 |
| Hadley Falls Postponed | Hydro | 3.3 mi | 3.5 |
| Homestead Fuel Cell Postponed | Gas, other | 3.5 mi | 8.4 |
| Elevate Middletown Announced | Storage | 3.7 mi | 275 |
| Middletown Solar Two Postponed | Solar | 3.9 mi | 1.9 |
| Middletown Solar One Postponed | Solar | 4.1 mi | 2 |
| Meriden Solar One Postponed | Solar | 4.6 mi | 1 |
| Holyoke MA BESS 1 Under construction | Storage | 5.0 mi | 5 |
| Broadleaf Solar Filed | Solar | 5.4 mi | 200 |
| Belchertown Solar PV + Battery Project Under construction | Solar + storage | 10.2 mi | 5.6 |
| Moodus Solar One Postponed | Solar | 12.2 mi | 2 |
| Willington Solar One, LLC Under construction | Solar | 13.1 mi | 2 |
Sources EIA-860M · EPA ICIS-Air