Deer Valley 230 kV line: route and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Deer Valley 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-AZ
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 8
- Substations at the ends (as the source names them)
- Deer Valley
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 311088 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| PHX01 / PHX02 / PHX03 / PHX05 Built | Large load | 0.2 mi | |
| APS - ALIGNED ENERGY DATA CENTER Built | Large load | 0.3 mi | |
| Amex Odyssey (Phoenix data centre) Filed | Large load | 8.7 mi | |
| QTS 40th Street Filed | Large load | 9.9 mi | |
| MCDOWELL ROAD DATA CENTER Built | Large load | 10.0 mi | |
| Stack Data Center Filed | Large load | 10.2 mi | |
| PHOENIX DATA CENTER Built | Large load | 11.0 mi | |
| Iron Mountain Data Center Under construction | Large load | 11.1 mi | |
| Desert Bloom Under construction | Storage | 11.1 mi | 150 |
| 11:11 Data Center Filed | Large load | 11.3 mi | |
| Compass Datacenter Under construction | Large load | 12.4 mi | |
| White Tank Energy Storage Under construction | Storage | 12.6 mi | 100 |
| MICROSOFT CORP - OLIVE AVE Built | Large load | 12.7 mi | |
| Microsoft Phx 83 (El Mirage data centre) Filed | Large load | 12.9 mi | |
| AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction | Large load | 13.1 mi |
Sources EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · EIA-860M