Show on map
Eland Solar & Storage Center, Phase 2 Hy — Power plant · Solar · 69SV 8me LLCBolthouse Solar LLC — Postponed · Solar · CA · 3 MW · 5.2 mi awayAratina Solar Center 2 — Under construction · Solar + storage · CA · 200 MW · 12.3 mi awayBellefield 3 Solar and Battery Storage — Contracted · Solar + storage · CA · 150 MW · 13.0 mi awayBellefield 2 Solar & Energy Storage Farm — Under construction · Solar + storage · CA · 500 MW · 14.7 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Eland Solar & Storage Center, Phase 2 Hy

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
230 kV to Los Angeles Department of Water & Power (LDWP)
Location
Kern County, California
Operated by
69SV 8me LLC

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Fuel burned (MMBtu), 2025915,632
Capacity factor, 20250.065
Net generation (MWh), 2025260,128
Balancing authority codeLDWP

Solar arrays

Array area (acres)
1,494.8
AC capacity (MW)
350
DC capacity (MW)
350
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
69SV 8me LLC Operator EIA-860M
Arevon Asset Management Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bolthouse Solar LLC Postponed Solar 5.2 mi 3
Aratina Solar Center 2 Under construction Solar + storage 12.3 mi 200
Bellefield 3 Solar and Battery Storage Contracted Solar + storage 13.0 mi 150
Bellefield 2 Solar & Energy Storage Farm Under construction Solar + storage 14.7 mi 500

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Attribution