Show on map
Energy Center San Diego — Power plant · Gas, reciprocating engine · Energy Center San Diego LLCCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 5.1 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 7.6 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 7.7 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 8.7 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 9.9 mi awayEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 10.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Energy Center San Diego

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2020 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2020
187 MWh
Location
San Diego County, California
Operated by
Energy Center San Diego LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2020
Fuel burned MMBtu by year, 2001 to 2020
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
40 years since 1986
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2020
Capacity retired
1.6 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
0001Natural Gas Internal Combustion Engine0.8 MWRetiredDecember 2020
0002Natural Gas Internal Combustion Engine0.8 MWRetiredDecember 2020

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 0001, 0002 scheduled to retire, 1.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CA National City Terminal Ave Under construction Solar 5.1 mi 1.1
EnerSmart Mesa Heights Sub Station Under construction Storage 7.6 mi 3
L3 Harris San Diego Under construction Solar 7.7 mi 1.6
Alvarado Hydro Facility Postponed Hydro 8.7 mi 1.4
EnerSmart Murray BESS Postponed Storage 9.9 mi 21
EnerSmart Imperial Beach BESS Postponed Storage 10.0 mi 6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution