Etiwanda Generating Station — Power plant · Gas, steam turbine · GenOn California South, LPSolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 0.6 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 0.8 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 0.8 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 1.2 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 1.4 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 1.8 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 1.9 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 1.9 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 2.3 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 3.9 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 4.1 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 4.2 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 6.1 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 6.3 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 6.6 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 6.6 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 8.9 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 9.5 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 10.0 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 11.8 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 14.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Etiwanda Generating Station

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 1% of 2017 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1953
Net generation, 2017
132,953 MWh
Location
San Bernardino County, California

Output

Net generation MWh by year, 2001 to 2018
Fuel burned MMBtu by year, 2001 to 2018
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
73 years since 1953
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002414138
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001446
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2018
First unit retired
October 2003
Capacity retired
1,050.1 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine123 MWRetiredOctober 2003
2Natural Gas Steam Turbine123 MWRetiredOctober 2003
5Natural Gas Fired Combustion Turbine138.1 MWRetiredDecember 2003
3Natural Gas Steam Turbine333 MWRetiredMay 2018
4Natural Gas Steam Turbine333 MWRetiredMay 2018
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine912 MW
Natural Gas Fired Combustion Turbine138.1 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
GenOn California South, LP Operator EIA-860M
GenOn Holdings LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 3, 4 scheduled to retire, 666 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 138.1 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 246 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #19 Postponed Solar 0.6 mi 5
Solar Photovoltaic Project #18 Postponed Solar 0.8 mi 0.5
Solar Photovoltaic Project #23 Postponed Solar 0.8 mi 0.5
Solar Photovoltaic Project #10 Postponed Solar 1.2 mi 0.5
Solar Photovoltaic Project #04 Postponed Solar 1.4 mi 1.5
Solar Photovoltaic Project #17 Postponed Solar 1.8 mi 0.5
Solar Photovoltaic Project #21 Postponed Solar 1.9 mi 2.5
Solar Photovoltaic Project #14 Postponed Solar 1.9 mi 1.5
Solar Photovoltaic Project #31 Postponed Solar 2.3 mi 1
Solar Photovoltaic Project #12 Postponed Solar 3.9 mi 0.5
Solar Photovoltaic Project #08 Postponed Solar 4.1 mi 0.5
Solar Photovoltaic Project #09 Postponed Solar 4.2 mi 0.5
Solar Photovoltaic Project #30 Postponed Solar 6.1 mi 1.5
Roadhouse Energy Center Contracted Storage 6.3 mi 300
Solar Photovoltaic Project #25 Postponed Solar 6.6 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 6.6 mi 1
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 8.9 mi 3
Solar Photovoltaic Project #24 Postponed Solar 9.5 mi 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 10.0 mi 4
OES Biogas Power Under construction Biomass 11.8 mi 2.6
Solar Photovoltaic Project #28 Postponed Solar 14.4 mi 0.5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO