Etiwanda Generating Station: location and 21 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Etiwanda Generating Station
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 1% of 2017 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1953
- Net generation, 2017
- 132,953 MWh
- Location
- San Bernardino County, California
- Operated by
- GenOn California South, LP
Output
- Gas
Details
Who’s behind it
- Owner
- GenOn Holdings LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 73 years since 1953
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2018
- First unit retired
- October 2003
- Capacity retired
- 1,050.1 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 123 MW | Retired | October 2003 |
| 2 | Natural Gas Steam Turbine | 123 MW | Retired | October 2003 |
| 5 | Natural Gas Fired Combustion Turbine | 138.1 MW | Retired | December 2003 |
| 3 | Natural Gas Steam Turbine | 333 MW | Retired | May 2018 |
| 4 | Natural Gas Steam Turbine | 333 MW | Retired | May 2018 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 912 MW | |
| Natural Gas Fired Combustion Turbine | 138.1 MW |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- CISO
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| GenOn California South, LP | Operator | EIA-860M | ||
| GenOn Holdings LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 3, 4 scheduled to retire, 666 MW · EIA-860M
- Stated Unit 5 scheduled to retire, 138.1 MW · EIA-860M
- Stated Units 1, 2 scheduled to retire, 246 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Photovoltaic Project #19 Postponed | Solar | 0.6 mi | 5 |
| Solar Photovoltaic Project #18 Postponed | Solar | 0.8 mi | 0.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 0.8 mi | 0.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 1.2 mi | 0.5 |
| Solar Photovoltaic Project #04 Postponed | Solar | 1.4 mi | 1.5 |
| Solar Photovoltaic Project #17 Postponed | Solar | 1.8 mi | 0.5 |
| Solar Photovoltaic Project #21 Postponed | Solar | 1.9 mi | 2.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 1.9 mi | 1.5 |
| Solar Photovoltaic Project #31 Postponed | Solar | 2.3 mi | 1 |
| Solar Photovoltaic Project #12 Postponed | Solar | 3.9 mi | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 4.1 mi | 0.5 |
| Solar Photovoltaic Project #09 Postponed | Solar | 4.2 mi | 0.5 |
| Solar Photovoltaic Project #30 Postponed | Solar | 6.1 mi | 1.5 |
| Roadhouse Energy Center Contracted | Storage | 6.3 mi | 300 |
| Solar Photovoltaic Project #25 Postponed | Solar | 6.6 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 6.6 mi | 1 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 8.9 mi | 3 |
| Solar Photovoltaic Project #24 Postponed | Solar | 9.5 mi | 4 |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 10.0 mi | 4 |
| OES Biogas Power Under construction | Biomass | 11.8 mi | 2.6 |
| Solar Photovoltaic Project #28 Postponed | Solar | 14.4 mi | 0.5 |