Etiwanda Generating Station — Power plant · Gas, steam turbine · GenOn California South, LPMandalay — Power plant · Gas, steam turbine · GenOn California South, LPCoolwater — Power plant · Gas, combined cycle · GenOn California South, LPSolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 0.6 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 0.8 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 0.8 mi awaySolar Photovoltaic Project #40 — Postponed · Solar · CA · 10 MW · 0.8 mi awaySolar Photovoltaic Project #41 — Postponed · Solar · CA · 10 MW · 0.8 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 1.2 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 1.4 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 1.8 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 1.9 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 1.9 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 2.3 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 3.9 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 4.1 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 4.2 mi awayMinneola Solar — Under construction · Solar · CA · 3 MW · 4.9 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 6.1 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 6.3 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 6.6 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 6.6 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 8.9 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 9.5 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 10.0 mi awayMission Rock Energy Center Hybrid — Postponed · Gas, combustion turbine · CA · 300 MW · 10.8 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 11.8 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 14.4 mi awaySanta Paula Energy Storage — Postponed · Storage · CA · 5 MW · 14.8 mi away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

GenOn California South, LP

Follow this company

Power plant owner

Key facts

Power plant owner · 2,351.4 MW
Capacity held
2,351.4MW
Assets
3
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 3

Assets

3

Capacity

2,351 MW

MW by fuel
  1. Gas, steam turbine: 1,624 MW, 2 assets
  2. Gas, combined cycle: 727 MW, 1 asset

Operates 3 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
Etiwanda Generating Station Gas, steam turbine Operates 1,050.1 MW US-CA GenOn California South, LP
Coolwater Gas, combined cycle Operates 727.3 MW US-CA GenOn California South, LP
Mandalay Gas, steam turbine Operates 574 MW US-CA GenOn California South, LP

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 26

within 15 mi

Projects

26

within 15 mi

Nearest

0.6 mi

Solar Photovoltaic Project #19

All 26NearbyShowing all 26 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Solar Photovoltaic Project #19 Solar 5 MW 0.6 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #18 Solar 0.5 MW 0.8 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #23 Solar 0.5 MW 0.8 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #40 Solar 10 MW 0.8 mi away nearest: Coolwater
Postponed Solar Photovoltaic Project #41 Solar 10 MW 0.8 mi away nearest: Coolwater
Postponed Solar Photovoltaic Project #10 Solar 0.5 MW 1.2 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #04 Solar 1.5 MW 1.4 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #17 Solar 0.5 MW 1.8 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #21 Solar 2.5 MW 1.9 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #14 Solar 1.5 MW 1.9 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #31 Solar 1 MW 2.3 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #12 Solar 0.5 MW 3.9 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #08 Solar 0.5 MW 4.1 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #09 Solar 0.5 MW 4.2 mi away nearest: Etiwanda Generating Station
Under construction Minneola Solar Solar 3 MW 4.9 mi away nearest: Coolwater
Postponed Solar Photovoltaic Project #30 Solar 1.5 MW 6.1 mi away nearest: Etiwanda Generating Station
Contracted Roadhouse Energy Center Storage 300 MW 6.3 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #25 Solar 4.5 MW 6.6 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #27 Solar 1 MW 6.6 mi away nearest: Etiwanda Generating Station
Under construction CA Bloomington 2551 S Lilac Avenue Micro Solar + storage 3 MW 8.9 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #24 Solar 4 MW 9.5 mi away nearest: Etiwanda Generating Station
Under construction CA Riverside 2356 Fleetwood Dr. Solar + storage 4 MW 10.0 mi away nearest: Etiwanda Generating Station
Postponed Mission Rock Energy Center Hybrid Gas, combustion turbine 300 MW 10.8 mi away nearest: Mandalay
Under construction OES Biogas Power Biomass 2.6 MW 11.8 mi away nearest: Etiwanda Generating Station
Postponed Solar Photovoltaic Project #28 Solar 0.5 MW 14.4 mi away nearest: Etiwanda Generating Station
Postponed Santa Paula Energy Storage Storage 5 MW 14.8 mi away nearest: Mandalay

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO