Show on map
- Wind & solar
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Other infrastructure
Famoso 70 kV line: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Famoso 70 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 70 kV
- States crossed
- US-CA
- Owner (as stated)
- Pacific Gas Electric
Details
Who’s behind it
- Owner
- Pacific Gas Electric
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 9
- Substations at the ends (as the source names them)
- Famoso
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | pacific gas electric |
| HIFLD line ID | 309453 |
| Voltage class | under 100 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bakersfield Driver Under construction | Solar + storage | 0.2 mi | 2 |
| Lerdo Middle Under construction | Solar | 0.3 mi | 2.4 |
| Imperator Solar Under construction | Solar | 0.6 mi | 2 |
| North Kern Water Storage District 1 Postponed | Solar | 2.2 mi | 2.5 |
| North Kern Water Storage District 2 Postponed | Solar | 2.2 mi | 2.5 |
| Ranch 4220 Under construction | Solar | 3.7 mi | 1.1 |
| Kern Front Postponed | Solar | 6.3 mi | 18.9 |
| Solar Photovoltaic Project #35 Postponed | Solar | 9.6 mi | 7 |
| Solar Photovoltaic Project #46 Postponed | Solar | 9.6 mi | 3.5 |
| Ranch 4701 Under construction | Solar | 11.7 mi | 2.3 |
Sources EIA-860M