- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
Harbor: location and 11 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Harbor
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 2% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1995
- Net generation, 2025
- 89,429 MWh
- Grid
- 138 kV to Los Angeles Department of Water & Power (LDWP)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles Department of Water & Power
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 31 years since 1995
- Unused energy
- 4,712 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 11,044 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 987,671 |
| Capacity factor, 2025 | 0.019 |
| Heat rate (Btu/kWh), 2025 | 11,044.2 |
| Net generation (MWh), 2025 | 89,429 |
| Balancing authority code | LDWP |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 47 MW
- Generators retired
- 2
- Capacity still in service
- 548.1 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GT6 | Natural Gas Fired Combustion Turbine | 23.5 MW | Retired | October 2002 |
| GT7 | Natural Gas Fired Combustion Turbine | 23.5 MW | Retired | October 2002 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Los Angeles Department of Water & Power
- Balancing authority
- Los Angeles Department of Water and Power
- NERC region
- WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Los Angeles Department of Water & Power | Operator | EIA-860M | ||
| CITY OF LOS ANGELES CALIFORNIA | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units GT6, GT7 scheduled to retire, 47 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Elevate Pier S Filed | Storage | 3.9 km | 70 |
| San Pedro Public Market (SPPM) Under construction | Solar | 4.6 km | 1.2 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 5.5 km | 94.2 |
| Dominguez - SLLAX512 Under construction | Solar | 8.5 km | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 8.9 km | 1.2 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 9.0 km | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 9.0 km | 1.3 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 9.5 km | 1.4 |
| Scattergood Postponed | Gas, combined cycle | 22.2 km | 346 |
| Westminster Reliability Project, LLC Under construction | Storage | 23.5 km | 110 |
| Cobalt Under construction | Solar + storage | 23.6 km | 250 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO