Show on map
Haynes — Power plant · Gas, combustion turbine · Los Angeles Department of Water & PowerWestminster Reliability Project, LLC — Storage · CA · 110 MW · 8.1 km awayElevate Pier S — Storage · CA · 70 MW · 11.5 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Solar · CA · 1.2 MW · 14.5 km awaySouth Bay Dis Ctr 6-SLLAX680 — Solar · CA · 1.3 MW · 14.5 km awayFordyce - SLLAX680 — Solar · CA · 1.3 MW · 14.5 km awayDominguez - SLLAX512 — Solar · CA · 1.3 MW · 14.6 km awayWatson Cogeneration — Gas, combined cycle · CA · 94.2 MW · 14.6 km awayVS HR Warner NEM, LLC — Solar · CA · 1 MW · 16.1 km awaySan Pedro Public Market (SPPM) — Solar · CA · 1.2 MW · 17.1 km awaySolar Photovoltaic Project #47 — Solar · CA · 1 MW · 18.3 km awayTorrance Dis Ctr 2 - SLLAX100 — Solar · CA · 1.4 MW · 22.0 km awayCobalt — Solar + storage · CA · 250 MW · 22.8 km awaySanta Ana Storage 3 — Storage · CA · 40 MW · 23.3 km awayBandini - SLLAX710 — Solar · CA · 1.3 MW · 24.6 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 11% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1962
Net generation, 2025
1,652,416 MWh
Grid
230 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
64 years since 1962
Unused energy
13,582 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,734 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110065702528
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006097
Fuel burned (MMBtu), 202512,779,760
Capacity factor, 20250.108
Heat rate (Btu/kWh), 20257,734
Net generation (MWh), 20251,652,416
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1,146 MW
Generators retired
4
Capacity still in service
1,739.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Natural Gas Steam Turbine230 MWRetiredDecember 2003
3Natural Gas Steam Turbine230 MWRetiredSeptember 2004
5Natural Gas Steam Turbine343 MWRetiredJune 2013
6Natural Gas Steam Turbine343 MWRetiredJune 2013

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Los Angeles Department of Water & Power
Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Los Angeles Department of Water & Power Operator EIA-860M
CITY OF LOS ANGELES CALIFORNIA Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 5, 6 scheduled to retire, 686 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 230 MW · EIA-860M
  • Stated Unit 4 scheduled to retire, 230 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Westminster Reliability Project, LLC Under construction Storage 8.1 km 110
Elevate Pier S Filed Storage 11.5 km 70
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 14.5 km 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 14.5 km 1.3
Fordyce - SLLAX680 Under construction Solar 14.5 km 1.3
Dominguez - SLLAX512 Under construction Solar 14.6 km 1.3
Watson Cogeneration Withdrawn Gas, combined cycle 14.6 km 94.2
VS HR Warner NEM, LLC Under construction Solar 16.1 km 1
San Pedro Public Market (SPPM) Under construction Solar 17.1 km 1.2
Solar Photovoltaic Project #47 Postponed Solar 18.3 km 1
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 22.0 km 1.4
Cobalt Under construction Solar + storage 22.8 km 250
Santa Ana Storage 3 Postponed Storage 23.3 km 40
Bandini - SLLAX710 Under construction Solar 24.6 km 1.3

Sources EIA-860M · CAISO

Sources

Attribution