Show on map
HEB00292 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCCity Breeze Energy Storage — Under construction · Storage · TX · 143.1 MW · 2.1 mi awayVentures BESS — Studied · Storage · TX · 238 MW · 2.2 mi awayBlackcat BESS — Studied · Storage · TX · 200.6 MW · 2.3 mi awayMatagorda Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 10.1 mi awayDuffy BESS — Under construction · Storage · TX · 241.1 MW · 11.7 mi awayEldora Energy LLC — Contracted · Solar + storage · TX · 402.2 MW · 12.7 mi awayIsaac Solar — Under construction · Solar · TX · 50.7 MW · 12.9 mi awayErin — Contracted · Solar · TX · 208.3 MW · 12.9 mi awayGulfStar Power, LLC — Under construction · Solar · TX · 451.6 MW · 14.4 mi awayPledger — Under construction · Storage · TX · 9.5 MW · 14.5 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
191 MWh
Grid
138 kV to AEP Texas Central Company (ERCO)
Location
Matagorda County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
10 years since 2016
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,136 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,700
Capacity factor, 20250.018
Heat rate (Btu/kWh), 202514,136.1
Net generation (MWh), 2025191
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
City Breeze Energy Storage Under construction Storage 2.1 mi 143.1
Ventures BESS Studied Storage 2.2 mi 238
Blackcat BESS Studied Storage 2.3 mi 200.6
Matagorda Clean Energy Center (BESS) Under construction Storage 10.1 mi 10.1
Duffy BESS Under construction Storage 11.7 mi 241.1
Eldora Energy LLC Contracted Solar + storage 12.7 mi 402.2
Isaac Solar Under construction Solar 12.9 mi 50.7
Erin Contracted Solar 12.9 mi 208.3
GulfStar Power, LLC Under construction Solar 14.4 mi 451.6
Pledger Under construction Storage 14.5 mi 9.5

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution