Kearny
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 1% of 2017 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1969
- Net generation, 2017
- 8,474 MWh
- Location
- San Diego County, California
- Operated by
- NRG Cabrillo Power Ops Inc
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- NRG Energy, Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 57 years since 1969
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2017
- First unit retired
- December 2014
- Capacity retired
- 161.5 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| KEA1 | Natural Gas Fired Combustion Turbine | 17.5 MW | Retired | December 2014 |
| KEA2 | Natural Gas Fired Combustion Turbine | 72 MW | Retired | December 2015 |
| KEA3 | Natural Gas Fired Combustion Turbine | 72 MW | Retired | December 2017 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- CISO
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| NRG Cabrillo Power Ops Inc | Operator | EIA-860M | ||
| NRG Energy, Inc | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit KEA3 scheduled to retire, 72 MW · EIA-860M
- Stated Unit KEA2 scheduled to retire, 72 MW · EIA-860M
- Stated Unit KEA1 scheduled to retire, 17.5 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| L3 Harris San Diego Under construction | Solar | 1.3 km | 1.6 |
| EnerSmart Mesa Heights Sub Station Under construction | Storage | 2.0 km | 3 |
| Alvarado Hydro Facility Postponed | Hydro | 10.5 km | 1.4 |
| EnerSmart Murray BESS Postponed | Storage | 11.5 km | 21 |
| Rancho Penasquitos Under construction | Hydro | 11.6 km | 4.3 |
| Pomerado Energy Storage, LLC Postponed | Storage | 14.7 km | 6 |
| EnerSmart El Cajon BESS Postponed | Storage | 19.7 km | 3 |
| CA National City Terminal Ave Under construction | Solar | 20.1 km | 1.1 |