Show on map
Kearny — Power plant · Gas, combustion turbine · NRG Cabrillo Power Ops IncL3 Harris San Diego — Solar · CA · 1.6 MW · 1.3 km awayEnerSmart Mesa Heights Sub Station — Storage · CA · 3 MW · 2.0 km awayAlvarado Hydro Facility — Hydro · CA · 1.4 MW · 10.5 km awayEnerSmart Murray BESS — Storage · CA · 21 MW · 11.5 km awayRancho Penasquitos — Hydro · CA · 4.3 MW · 11.6 km awayPomerado Energy Storage, LLC — Storage · CA · 6 MW · 14.7 km awayEnerSmart El Cajon BESS — Storage · CA · 3 MW · 19.7 km awayCA National City Terminal Ave — Solar · CA · 1.1 MW · 20.1 km away
  • Combustion
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 1% of 2017 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1969
Net generation, 2017
8,474 MWh
Location
San Diego County, California

Output

Net generation MWh by year, 2001 to 2017
Fuel burned MMBtu by year, 2001 to 2017
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
57 years since 1969
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110030903823
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1010540
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2017
First unit retired
December 2014
Capacity retired
161.5 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
KEA1Natural Gas Fired Combustion Turbine17.5 MWRetiredDecember 2014
KEA2Natural Gas Fired Combustion Turbine72 MWRetiredDecember 2015
KEA3Natural Gas Fired Combustion Turbine72 MWRetiredDecember 2017

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
NRG Cabrillo Power Ops Inc Operator EIA-860M
NRG Energy, Inc Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit KEA3 scheduled to retire, 72 MW · EIA-860M
  • Stated Unit KEA2 scheduled to retire, 72 MW · EIA-860M
  • Stated Unit KEA1 scheduled to retire, 17.5 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
L3 Harris San Diego Under construction Solar 1.3 km 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 2.0 km 3
Alvarado Hydro Facility Postponed Hydro 10.5 km 1.4
EnerSmart Murray BESS Postponed Storage 11.5 km 21
Rancho Penasquitos Under construction Hydro 11.6 km 4.3
Pomerado Energy Storage, LLC Postponed Storage 14.7 km 6
EnerSmart El Cajon BESS Postponed Storage 19.7 km 3
CA National City Terminal Ave Under construction Solar 20.1 km 1.1

Sources EIA-860M